What is a dam-displacement protest? Oustees, rehabilitation and submergence

What it is Key words Before submergence Which projects Land for land 2000 ruling Numbers News Our reports FAQ Sources

Short answer

A dam-displacement protest is held by people who lose, or will lose, their homes or land to a dam project. Indian English calls them oustees (Wiktionary). For land acquired for an irrigation or hydel project, being a public purpose, the 2013 land law says rehabilitation and resettlement "shall be completed six months prior to submergence of the lands acquired".

This guide is general information, not legal advice. It describes what the 2013 land law, court rulings and news reports say. It does not take the side of any government, company, community or group.

When a dam’s reservoir fills, land in it can go under water. The Tribune reported on 12 April 2024 that 1,508 hectares of land "would submerge in the dam reservoir, while a 24-km tunnel would be constructed for it." That was the Renukaji dam in Himachal Pradesh. This guide explains the words used in protests by families who have to move, and what the law and courts have said.

What is a dam-displacement protest?

In this guide, a dam-displacement protest is one by people who lose, or will lose, their homes or land to a dam project. It is our working term, not a legal one.

To displace means "to force people to move away from their home to another place" (Oxford Learner’s Dictionaries).

In the reports we read, the demands are about the move: lists, compensation, land and where people will live. Three examples:

  • Panna, Madhya Pradesh. Our Panna dam oustees report lists the demands as "full compensation and rehabilitation before submergence, inclusion of families left out, and a transparent survey with a public final list of who is eligible". It cites Dainik Bhaskar.
  • Renuka dam, Himachal Pradesh. The Tribune reported on 10 April 2026 that families facing displacement staged a protest "demanding fair resettlement and compensation".
  • Hidkal dam, Karnataka. The Hindu reported on 16 July 2026 on a "day-and-night protest seeking fair compensation and proper rehabilitation for land acquired from farmers for the Hidkal Dam project" in Belagavi.

Protest forms vary. For common protest words, see our guide to dharna, gherao, bandh, hartal and chakka jam. For the law on protests in general, see our guide to rights at a protest.

Baandh is not bandh. Wiktionary gives the Hindi word बाँध (baandh) as a "dam", "on a river or water body". It gives the English word bandh as "A general strike, shutdown, or other form of protest used in South Asia in which a substantial portion of the population stays home and does not report to work." Our guides use bandh in that second sense. See our guide to dharna, gherao, bandh, hartal and chakka jam and our guide on whether a bandh is legal.

Key words: who is an oustee?

  • Oustee. Wiktionary marks it "chiefly India" and defines it as "A person who is ousted, especially one who is removed from his place of residence or land to make room for an infrastructure improvement or public works project." The Oxford Learner’s Dictionaries has no entry for it.
  • Oustee, in one project. The Sardar Sarovar dam’s tribunal Award had its own definition, quoted by the Supreme Court in 2005: "An ‘oustee’ shall mean any person who since at least one year prior to the date of publication of the notification under Section 4 of the Act, has been ordinarily residing or cultivating land or carrying on any trade, occupation, or calling or working for gain in the area likely to be submerged permanently or temporarily." It was written for that project.
  • Displaced family. Section 3(k) of the 2013 land law: "‘displaced family’ means any family, who on account of acquisition of land has to be relocated and resettled from the affected area to the resettlement area".
  • Affected family. Section 3(c) says an "affected family" includes six groups. They are quoted in full below.
  • Project affected family. Some reports use this phrase, such as The Tribune and Hindustan Times. The 2013 law uses it too, but we found no definition of it in the Act.
  • Reservoir: "a natural or artificial lake where water is stored before it is taken by pipes to houses, etc." (Oxford).
  • Submerge: "to go under the surface of water or liquid; to put something or make something go under the surface of water or liquid" (Oxford). The 2013 law uses the word "submergence" but does not define it.
  • Resettlement: "the act or process of helping people go and live in a new country or area; the act of going to live in a new country or area" (Oxford).
  • Compensation: "something, especially money, that somebody gives you because they have hurt you or damaged something that you own; the act of giving this to somebody" (Oxford).
  • Rehabilitation and resettlement (R&R). The 2013 law pairs the two words. It does not define rehabilitation. Its Second Schedule lists the "Elements of Rehabilitation and Resettlement Entitlements", shown below.

The six groups in an "affected family" (section 3(c)), in the Act’s words:

  1. "a family whose land or other immovable property has been acquired"
  2. "a family which does not own any land but a member or members of such family may be agricultural labourers, tenants including any form of tenancy or holding of usufruct right, share-croppers or artisans or who may be working in the affected area for three years prior to the acquisition of the land, whose primary source of livelihood stand affected by the acquisition of land"
  3. "the Scheduled Tribes and other traditional forest dwellers who have lost any of their forest rights recognised under the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 ( 2 of 2007 ) due to acquisition of land"
  4. "family whose primary source of livelihood for three years prior to the acquisition of the land is dependent on forests or water bodies and includes gatherers of forest produce, hunters, fisher folk and boatmen and such livelihood is affected due to acquisition of land"
  5. "a member of the family who has been assigned land by the State Government or the Central Government under any of its schemes and such land is under acquisition"
  6. "a family residing on any land in the urban areas for preceding three years or more prior to the acquisition of the land or whose primary source of livelihood for three years prior to the acquisition of the land is affected by the acquisition of such land"

What R&R covers. The Second Schedule has eleven items. Their headings, in the Act’s words, are:

  1. Provision of housing units in case of displacement
  2. Land for Land
  3. Offer for Developed Land
  4. Choice of Annuity or Employment
  5. Subsistence grant for displaced families for a period of one year
  6. Transportation cost for displaced families
  7. Cattle shed/ petty shops cost
  8. One-time grant to artisan, small traders and certain others
  9. Fishing rights
  10. One-time Resettlement Allowance
  11. Stamp duty and registration fee

Must families be resettled before the water rises?

The 2013 law is the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The Act says "Collector" means "the Collector of a revenue district, and includes a Deputy Commissioner and any officer specially designated by the appropriate Government to perform the functions of a Collector under this Act". Section 38 is about when the Collector takes possession of acquired land. Section 38(1) begins:

"The Collector shall take possession of land after ensuring that full payment of compensation as well as rehabilitation and resettlement entitlements are paid or tendered to the entitled persons within a period of three months for the compensation and a period of six months for the monetary part of rehabilitation and resettlement entitlements listed in the Second Schedule commencing from the date of the award made under section 30".

A proviso is "a condition that must be accepted before an agreement can be made" (Oxford). Hydel means "hydroelectric", that is "using the power of water to produce electricity; produced by the power of water" (Oxford). Section 38(1) has two provisos. The first says: "Provided that the components of the Rehabilitation and Resettlement Package in the Second and Third Schedules that relate to infrastructural entitlements shall be provided within a period of eighteen months from the date of the award". The second is about hydel and irrigation projects:

"Provided further that in case of acquisition of land for irrigation or hydel project, being a public purpose, the rehabilitation and resettlement shall be completed six months prior to submergence of the lands acquired."

Note its limits (our reading). It covers acquisition of land for an "irrigation or hydel project, being a public purpose". Its deadline is tied to the submergence of "the lands acquired".

Section 38(2) is not limited to dams (our reading). It says: "The Collector shall be responsible for ensuring that the rehabilitation and resettlement process is completed in all its aspects before displacing the affected families."

Moved twice. Section 39 says: "The Collector shall, as far as possible, not displace any family which has already been displaced by the appropriate Government for the purpose of acquisition under the provisions of this Act, and if so displaced, shall pay an additional compensation equivalent to that of the compensation determined under this Act for the second or successive displacements."

Fishing in the reservoir. Two parts of the Act use different modal verbs:

  • Second Schedule item 9: "In cases of irrigation or hydel projects, the affected families may be allowed fishing rights in the reservoirs, in such manner as may be prescribed by the appropriate Government."
  • Section 41(10): "The affected Scheduled Tribes, other traditional forest dwellers and the Scheduled Castes having fishing rights in a river or pond or dam in the affected area shall be given fishing rights in the reservoir area of the irrigation or hydel projects."

The first says "may". The second says "shall", for the groups it names.

Does the 2013 law cover every dam project?

Not always. The Act does not apply to land acquired under some other laws. Section 105(1) says: "Subject to sub-section (3), the provisions of this Act shall not apply to the enactments relating to land acquisition specified in the Fourth Schedule." That list includes the Damodar Valley Corporation Act, 1948 and the Electricity Act, 2003.

Section 105(3) says the Central Government "shall, by notification, within one year from the date of commencement of this Act" direct that the Act’s compensation and R&R provisions apply to those laws. It may also direct that they apply with exceptions or changes "that do not reduce the compensation or dilute the provisions of this Act relating to compensation or rehabilitation and resettlement". We did not read that notification. We cannot say which dam projects fall under these other laws.

Better state terms. Section 108(2) says: "Where a State law or a policy framed by the Government of a State offers more beneficial rehabilitation and resettlement provisions under that Act or policy than under this Act, the affected persons or his family or member of his family may at his option opt to avail such rehabilitation and resettlement provisions under such State law or such policy of the State instead of under this Act."

State changes. The copy we read shows amendments made by Gujarat, Tamil Nadu and Maharashtra. Gujarat added a section 31A. It begins "Notwithstanding anything contained in this Act". It lets the state pay, "as Rehabilitation and Resettlement cost", a lump sum "equal to fifty per cent" of the compensation. It covers land acquired for the state’s "own use amounting to less than one hundred acres", or for projects "which are linear in nature as referred to in proviso to sub-section (4) of section 10". We have not checked every state’s version.

Social impact study. Section 6(2) says that where an Environment Impact Assessment (EIA) is carried out, "a copy of the Social Impact Assessment report shall be made available to the Impact Assessment Agency authorised by the Central Government to carry out environmental impact assessment". Its proviso says:

"Provided that, in respect of irrigation projects where the process of Environment Impact Assessment is required under the provisions of any other law for the time being in force, the provisions of this Act relating to Social Impact Assessment shall not apply."

We did not read the EIA rules or the National Rehabilitation and Resettlement Policy, 2007. So this guide says nothing about them, or about which projects need an EIA.

Land for land or cash: what have courts said?

Start with the Act. Second Schedule item 2, "Land for Land", says:

"In the case of irrigation project, as far as possible and in lieu of compensation to be paid for land acquired, each affected family owning agricultural land in the affected area and whose land has been acquired or lost, or who has, as a consequence of the acquisition or loss of land, been reduced to the status of a marginal farmer or landless, shall be allotted, in the name of each person included in the records of rights with regard to the affected family, a minimum of one acre of land in the command area of the project for which the land is acquired".

Its proviso: "Provided that in every project those persons losing land and belonging to the Scheduled Castes or the Scheduled Tribes will be provided land equivalent to land acquired or two and a one-half acres, whichever is lower."

Two limits sit in the item’s own words (our reading). It is for an "irrigation project", and it applies "as far as possible". The Act does not define "command area".

The rulings below each decided their own case. They are about dams on the Narmada river, and all came before the 2013 law.

Supreme Court, 15 March 2005, Sardar Sarovar rehabilitation ruling, (2005) 4 SCC 32. A bench of three judges heard applications by families affected by the Sardar Sarovar dam. Justice S.B. Sinha wrote the judgment. On the choice of land, it said:

"In a case of this nature we do not accept the contention raised on behalf of the applicants herein that the oustees are entitled to opt for land of their choice and the State is bound to acquire or purchase lands for the said purpose. The State has constituted a land bank. Normally, those lands which are available from the land bank should be allotted and in relation thereto, the parties may have a choice. But they cannot reject such land only unless it is shown that the lands are not irrigable or cultivable or otherwise unsuitable."

The same ruling read the project’s Award. It said: "Sub-Clause IV (6)(ii) of Clause XI of the Award states that no kind of submergence in the States of Madhya Pradesh and Maharashtra shall be permitted unless arrangements are made for rehabilitation of the oustees in terms of the directions contained therein. Thus, complete resettlement and rehabilitation of oustees was a condition precedent for submergence."

Supreme Court, 11 May 2011, Omkareshwar dam ruling, (2011) 7 SCC 639. Justice B.S. Chauhan wrote it for a bench of three. The Omkareshwar dam is in Madhya Pradesh. In that case the court said of the Sardar Sarovar Award:

"The said Award has no application in the instant cases nor can it be a Bench Mark. More so, in the Sardar Sarovar Project, land for land was mandatory. These cases are to be decided giving strict adherence to the R & R Policy, as amended on 3.7.2003, further considering that special care is to be taken where persons are oppressed and uprooted so that they are better off."

It also said: "Mere payment of compensation to the oustees in such a case may not be enough."

In its conclusions, it modified a High Court direction. Displaced families who had not voluntarily withdrawn their benefits or compensation, and who applied, "shall be entitled to the allotment of agricultural land "as far as possible" in terms of the R & R Policy, and for that purpose, the appellants must make some government or private land available for allotment to such oustees if they opt for such land and agree to ensure compliance with other terms and conditions stipulated therein."

After reviewing earlier rulings, the same judgment said "it is evident that acquisition of land does not violate any constitutional/fundamental right of the displaced persons. However, they are entitled to resettlement and rehabilitation as per the policy framed for the oustees of the concerned project."

Supreme Court, 2 August 2011, canal-affected persons ruling, (2011) 8 SCC 55. This was about land taken for canals of the Indira Sagar and Omkareshwar projects. The same bench relied on the 2000 Sardar Sarovar ruling, which it quoted. It said: "This Court has taken a view that the canal affected persons cannot be put at par with the submergence affected persons, thus, it is not possible for the court to put the canal affected persons at par with the submergence affected persons."

None of these rulings ordered land for land for all dam projects (our reading).

What did the 2000 Narmada ruling decide?

The Sardar Sarovar dam is on the Narmada river. The 2011 Omkareshwar ruling says the Narmada Water Disputes Tribunal "apportioned the water in the Narmada between Madhya Pradesh, Gujarat, Maharashtra and Rajasthan, subject to review after 45 years." A tribunal is "a type of court with the authority to deal with a particular problem or disagreement" (Oxford).

Supreme Court, 18 October 2000, Sardar Sarovar dam ruling, (2000) 10 SCC 664. Justice B.N. Kirpal wrote the judgment. Indian Kanoon lists him and Dr A.S. Anand on the bench. The 2005 ruling calls it a judgment of "A three-Judge Bench".

A court order of 23 November 2000 calls it "the majority judgment". In that order, Justice S.P. Bharucha wrote: "For myself, I stand by my minority judgment." We did not read the minority judgment.

The judgment said why the court took up the case: "In short it was only the concern of this Court for the protection of the fundamental rights of the oustees under Article 21 of the Constitution of India which led to the entertaining of this petition."

Its first two directions say:

  • "1) Construction of the dam will continue as per the Award of the Tribunal."
  • "2) As the Relief and Rehabilitation Sub-group has cleared the construction up to 90 meters, the same can be undertaken immediately. Further raising of the height will be only pari passu with the implementation of the relief and rehabilitation and on the clearance by the Relief and Rehabilitation Sub-group. The Relief and Rehabilitation Sub-Group will give clearance of further construction after consulting the three Grievances Redressal Authorities."

Wiktionary defines pari passu as "Simultaneously; likewise, equally" and, in legal use, "At an equal rate." So construction was to go on, with each rise in height tied to rehabilitation (our reading of directions 1 and 2).

Direction 7 directed the Narmada Control Authority (NCA) to draw up an action plan. It said: "Such an Action Plan will fix a time frame so as to ensure relief and rehabilitation pari passu with the increase in the height of the dam."

On displacement, the judgment said: "The displacement of the tribals and other persons would not per se result in the violation of their fundamental or other rights. The effect is to see that on their rehabilitation at new locations they are better off than what they were." The 2011 Omkareshwar ruling quotes this as paragraph 62 of the 2000 judgment.

The 2000 ruling was about one project and its Award. As noted above, the 2011 ruling said that Award "has no application" to the Omkareshwar cases.

Why do the numbers differ?

Counts change over time and depend on who is counted (our reading). Three reports by one outlet on the same dam show this. All are from The Tribune, on the Renuka dam in Sirmaur:

  • 12 April 2024: "The district administration has declared 1,362 families as affected by the project, while 95 families were declared homeless by the District Collector last year in the first phase of the Renukaji multipurpose dam project."
  • 7 January 2025: "As many as 1,362 families have been notified as main project affected families under the first phase." The same report says 1,362 of "the 2,400 affected families from 37 villages of 20 panchayats" had been notified.
  • 10 April 2026: the dam "is expected to impact nearly 7,000 people across 41 villages in 17 panchayats, with 1,408 families facing direct displacement."

The groups differ: families "affected", "main project affected families" and families "facing direct displacement". The reports also come from different phases and dates.

Payment figures change too. Our Panna dam oustees report gives the Collector’s figures, as told to The Hindu: "1,219 of the 1,450 displaced families have been paid Rs 5 lakh each; 231 are pending because of inheritance cases or missing documents, according to the Collector."

We did not read an official national total of people displaced by dams, so this guide gives none.

How is this different from PESA consent?

Our PESA guide covers a different question: the gram sabha’s role in Scheduled Areas. That guide quotes PESA: the gram sabha or panchayats "shall be consulted before making the acquisition of land in the Scheduled Areas for development projects and before re-settling or rehabilitating persons affected by such projects in the Scheduled Areas". This guide is about families who have to move.

What do recent news reports show?

  • Renuka dam (The Tribune, 10 April 2026). "According to the oustees, several families initially identified as homeless are being gradually removed." The report says a General Manager "stated that cases of excluded families are under review and that the management is sensitive to their concerns." That line does not name the body the General Manager works for. The report says the project is "being executed by HP Power Corporation Limited".
  • Hidkal dam (The Hindu, 16 July 2026). Farmers from 24 villages protested in front of the North Zone office of Karnataka Neeravari Nigam Limited (KNNL). They "have accused officers of deliberately fixing low rates for acquired land and delaying compensation", The Hindu reported. The report carries no statement from KNNL.
  • Gargai dam, Palghar (Hindustan Times, 7 April 2026). The report says the Standing Committee of the BMC, which it calls "the civic body", cleared the project. "A 2022 survey identified 619 families eligible for rehabilitation and compensation, though BMC officials said the number could rise." A valuation committee chaired by the Palghar district collector "will determine land rates before the final package is disclosed."
  • The same report says: "Officials clarified that the process was not being carried out as compulsory acquisition but through a direct negotiation model, with the civic body engaging affected persons, similar to the approach adopted for the Samruddhi Mahamarg."
  • Madhya Pradesh package (The New Indian Express, 16 December 2025). The state cabinet approved a Rs 1,782 crore special relief package for three projects in Anuppur, Mandla and Dindori districts. "As many as 13,873 families are likely to be affected by submergence and will receive compensation of Rs 12.50 lakh per family under the special package."
  • Pong dam (The Tribune, 9 August 2026). The paper reported a meeting of the Pong Dam Oustees Samiti. "The speakers said around 16,350 families were displaced by the Pong Dam project in 1970 and declared eligible for rehabilitation in Rajasthan, but nearly 8,800 eligible oustees were still awaiting rehabilitation." These are the speakers’ figures.

In the Renuka, Hidkal and Pong reports, the complaints include lists, land rates, delays or resettlement land (our reading).

Where can you read the law and the rulings?

  • The 2013 Act: Indian Kanoon copy. Indian Kanoon notes: "The original publication document is not available and this content could not be verified."
  • The rulings: 2000, 23 November 2000 order, 2005, May 2011 and August 2011, all on Indian Kanoon.
  • A project’s lists and package: in the reports we read, the district administration declared the Renuka list (The Tribune). A 2022 survey identified the Gargai families (Hindustan Times). A state cabinet approved the Madhya Pradesh package (The New Indian Express).

Examples from our reports

Two of our live reports are about dams and the families or villages they affect. A third is listed as See also. Each note uses the live page’s own words.

  • Panna protest by families displaced by the Majhgaon and Runjh irrigation dams and the Ken-Betwa river link: families want full compensation and rehabilitation before their land is submerged (Dainik Bhaskar, The Hindu). Protesters cite Section 38 of the 2013 law (PTI, Dainik Bhaskar). The page gives the Collector’s payment figures, as told to The Hindu.
  • Kulsi dam protests on the Assam-Meghalaya border: people on both sides of the border oppose a planned 55 MW hydropower and irrigation project at Ukiam. Members of the Assam-Meghalaya Joint Protection Committee (AMJPC) from Assam asked for communities and traditional institutions to be consulted (The Hindu, NE Now). The page found no response from either state government.
  • Bedti-Aghanashini river-linking protest in Karnataka: See also. A rally against two proposed river links. Our page cites Deccan Herald: in December 2025 Karnataka gave in-principle approval for a Detailed Project Report (DPR) to be prepared for Bedti-Varada, and the then Deputy Chief Minister said he had sought the pre-feasibility report for Aghanashini-Vedavati. Our report does not describe any displacement.

Frequently asked questions

Who is an oustee?

Wiktionary marks the word "chiefly India". It defines an oustee as "A person who is ousted, especially one who is removed from his place of residence or land to make room for an infrastructure improvement or public works project." The 2013 land law does not use the word in its definitions. It defines an "affected family" and a "displaced family".

Must families be resettled before a dam fills?

For acquisition of land for an "irrigation or hydel project, being a public purpose", section 38(1) of the 2013 law says R&R "shall be completed six months prior to submergence of the lands acquired." Section 38(2) makes the Collector responsible for completing R&R "before displacing the affected families."

Do oustees always get land for land?

The Act’s land-for-land item is for an "irrigation project" and applies "as far as possible". In a 2005 Sardar Sarovar case, the Supreme Court did not accept that oustees were "entitled to opt for land of their choice and the State is bound to acquire or purchase lands for the said purpose." It added that from the land bank "the parties may have a choice". In a 2011 Omkareshwar case, it said: "More so, in the Sardar Sarovar Project, land for land was mandatory." It decided that case under the state’s R&R Policy.

Did the Supreme Court stop the Sardar Sarovar dam?

Its 18 October 2000 judgment directed: "Construction of the dam will continue as per the Award of the Tribunal." Further raising of the height was to be "only pari passu with the implementation of the relief and rehabilitation" and on the Sub-group’s clearance.

Is baandh (dam) the same as bandh?

No. Wiktionary gives the Hindi बाँध (baandh) as a dam. It gives bandh as a general strike or shutdown in South Asia. Our guides on bandh use the second meaning.

Do people who lose land to canals get the same package?

In a 2011 Madhya Pradesh case on canal land, the Supreme Court relied on its 2000 Sardar Sarovar ruling. It said "the canal affected persons cannot be put at par with the submergence affected persons". That ruling was about the Indira Sagar and Omkareshwar canal networks and the state’s policy.

This guide is general information, not legal advice. It describes what the 2013 land law, court rulings and named news reports say. Each ruling decided its own case. It does not take the side of any government, company, community or group. Laws, policies and lists change: check the official text. Correction, 20 October 2026: we had said both Karnataka river links in our Bedti-Aghanashini report were "at the project-report stage". That report gives approval to prepare a DPR only for Bedti-Varada; for Aghanashini-Vedavati it says a pre-feasibility report had been sought.

Last checked 15 October 2026.

Sources

Accessed 15 October 2026. The tag shows how much of each source we read: in full, only in part (for example a paywalled or cut-off article), or not at all.

  1. Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Indian Kanoon). Partly read Sections 3(c), 3(k), 6(2), 38, 39, 41(10), 105, 108, the Second and Fourth Schedules and the state amendments read. Indian Kanoon notes this copy could not be verified.
  2. Supreme Court of India, judgment of 18 October 2000 (Sardar Sarovar dam), (2000) 10 SCC 664 (Indian Kanoon), 18 October 2000. Partly read The parts on why the court heard the case and on displacement, and the directions, read.
  3. Supreme Court of India, order of 23 November 2000 (Sardar Sarovar dam) (Indian Kanoon), 23 November 2000. Read in full
  4. Supreme Court of India, judgment of 15 March 2005 (Sardar Sarovar rehabilitation), (2005) 4 SCC 32 (Indian Kanoon), 15 March 2005. Read in full
  5. Supreme Court of India, judgment of 11 May 2011 (Omkareshwar dam), (2011) 7 SCC 639 (Indian Kanoon), 11 May 2011. Partly read The parts on land for land, the Award, fundamental rights and the conclusions read.
  6. Supreme Court of India, judgment of 2 August 2011 (canal-affected persons, Madhya Pradesh), (2011) 8 SCC 55 (Indian Kanoon), 2 August 2011. Partly read The facts and the part on canal-affected persons read.
  7. Wiktionary, "oustee". Read in full
  8. Wiktionary, "बाँध" (Hindi). Read in full
  9. Wiktionary, "bandh". Read in full
  10. Wiktionary, "pari passu". Read in full
  11. Oxford Learner’s Dictionaries, "displace". Read in full
  12. Oxford Learner’s Dictionaries, "reservoir". Read in full
  13. Oxford Learner’s Dictionaries, "submerge". Read in full
  14. Oxford Learner’s Dictionaries, "resettlement". Read in full
  15. Oxford Learner’s Dictionaries, "compensation". Read in full
  16. Oxford Learner’s Dictionaries, "proviso". Read in full
  17. Oxford Learner’s Dictionaries, "hydel". Read in full
  18. Oxford Learner’s Dictionaries, "hydroelectric". Read in full
  19. Oxford Learner’s Dictionaries, "tribunal". Read in full
  20. The Tribune, "Renukaji dam oustees unhappy over land chosen for rehabilitation", 12 April 2024. Read in full
  21. The Tribune, "Families hit by Renuka dam project start getting I-cards", 7 January 2025. Read in full
  22. The Tribune, "Renuka Dam oustees protest, allege exclusion from rehabilitation lists", 10 April 2026. Read in full
  23. The Tribune, "Pong Dam oustees seek end to 55-year rehabilitation ordeal", 9 August 2026. Read in full
  24. The Hindu, "Protest by people displaced by Hidkal Dam continues in Belagavi", 16 July 2026. Read in full
  25. Hindustan Times, "Gargai Dam-affected families could get 5 times more land", 7 April 2026. Read in full
  26. The New Indian Express, "MP announces Rs 1,782 crore compensation package for thousands displaced by dam projects", 16 December 2025. Read in full
  27. Dainik Bhaskar, PTI, The Hindu (Panna and Kulsi reports) and NE Now, as cited by our live reports. Not read Named only as our live reports cite them.

Spotted an error, or a source we missed? Email a correction with the source that shows it. See how we handle corrections. Back to top