Guide

Land acquisition and compensation in India: why villagers protest

How it is worked out Four times? Solatium Consent SIA Highways 1894 cases Disputes Why villagers protest FAQ Sources

Short answer

Under India’s 2013 land law, compensation starts from market value. A factor of 1 (urban) or 1 to 2 (rural, as notified, usually by the state) applies. With 100% solatium, the land part comes to 2 to 4 times market value, a minimum; states may pay more. In our reports, villagers protest over rates, rehabilitation, consent and lost farmland.

This guide is general information, not legal advice. It describes what the 2013 law, the National Highways Act and court rulings say. It does not tell anyone what to do. States have changed the law in places, and courts decide each case on its facts.

The main law is the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. We call it the 2013 Act. It repealed the Land Acquisition Act, 1894 (s. 114(1)).

PRS Legislative Research explains: "Land acquisition is the process by which land owned by private persons is compulsorily acquired." The Constitution says: "No person shall be deprived of his property save by authority of law." (Article 300A).

Oxford Learner’s Dictionaries defines compensation as "something, especially money, that somebody gives you because they have hurt you or damaged something that you own; the act of giving this to somebody".

This guide gives no rates in rupees. Factors and amounts are set by governments and change. We quote the Act where we can. We read the Act on Indian Kanoon, which notes that its copy "could not be verified".

How is land acquisition compensation worked out?

The Collector works it out. Oxford Learner’s Dictionaries defines a collector as "(in India) the chief government official of a district, responsible for general administration, development programmes, etc."

Step 1: market value. Section 26(1) gives three bases. The Collector takes "whichever is higher" of:

  • "the market value, if any, specified in the Indian Stamp Act, 1899 ( 2 of 1899 ) for the registration of sale deeds or agreements to sell, as the case may be, in the area, where the land is situated" (s. 26(1)(a));
  • "the average sale price for similar type of land situated in the nearest village or nearest vicinity area" (s. 26(1)(b));
  • for private company or public-private partnership projects, the "consented amount of compensation as agreed upon under sub-section (2) of section 2" (s. 26(1)(c)).

The value is taken on the date of the notification under section 11 (the proviso to s. 26(1)). For the average sale price, the Act looks at sale deeds from the three years before. It counts the half of those deeds with the highest prices (Explanations 1 and 2).

Step 2: the factor. "The market value calculated as per sub-section (1) shall be multiplied by a factor to be specified in the First Schedule." (s. 26(2)). The next section explains the factor.

Step 3: assets on the land. The Collector "shall calculate the total amount of compensation to be paid to the land owner (whose land has been acquired) by including all assets attached to the land." (s. 27).

Step 4: solatium. A solatium equal to the compensation is added (s. 30(1)). See the solatium section below.

Step 5: interest for the waiting time. Section 30(3) adds 12% a year on the market value. It runs from the notification of the social impact assessment study until the award or the taking of possession, "whichever is earlier".

The Act does not use the words "circle rate". We searched the copy we read.

Is it really four times the market value?

Not always. Under the Act’s formula, four times is reached only where the highest rural factor applies. The Act sets no fixed "four times" rule. It is also not a ceiling. The First Schedule calls its list "the minimum compensation package to be given to those whose land is acquired and to tenants referred to in clause (c) of section 3 in a proportion to be decided by the appropriate Government." So tenants share the package, in a proportion the government decides.

The First Schedule sets the factor. For rural areas it is "1.00 (One) to 2.00 (Two) based on the distance of project from urban area, as may be notified by the appropriate Government." For urban areas it is "1 (One)".

For land in a state, the "appropriate Government" is the state government (s. 3(e)(i)). The Act lists some exceptions, such as projects in more than one state.

Our arithmetic from the First Schedule:

  • Rural land with a factor of 2: market value times 2, plus assets. Solatium doubles this. The land part reaches four times the market value.
  • Rural land with a factor of 1, or urban land: market value times 1, plus assets. Solatium doubles this. The land part reaches two times.

PRS Legislative Research describes the result as compensation "set at two to four times of prevailing market rates". We have not read each state’s factor notification, so we do not list them. Interest under section 30(3) is a separate amount.

States may pay more. Section 107 lets a state make a law "which confers higher compensation than payable under this Act". Under section 108(1), where a state law or policy provides "a higher compensation than calculated under this Act", affected persons or their families "may at their option opt to avail" it.

What is solatium?

Solatium is an extra sum on top of compensation. Section 30(1) says the Collector shall "impose a ‘Solatium’ amount equivalent to one hundred per cent. of the compensation amount." Its Explanation adds that solatium "shall be in addition to the compensation payable".

It is not 100% of the land price alone. The First Schedule works it out on the market value times the factor, plus the value of assets attached to the land or building.

Rehabilitation and resettlement entitlements come on top, under the Second Schedule. The Collector passes a rehabilitation and resettlement award for each affected family (s. 31(1)).

Not every acquisition needs consent. Section 2(2) asks for the prior consent of at least 80% of affected families when land is acquired for private companies. For public-private partnership projects it is 70%. Only families "as defined in sub-clauses (i) and (v) of clause (c) of section 3" are counted. PRS Legislative Research summarises the 2013 Act’s rule as: "No consent required for government projects." Scheduled Areas have a separate consent rule in section 41(3). Our PESA and gram sabha consent guide explains these terms, quotes both rules and covers the court rulings.

What is a social impact assessment?

PRS Legislative Research says the Act required a Social Impact Assessment (SIA) "to determine whether the potential benefits of the project would outweigh the social costs."

Section 4(1) says that when the government intends to acquire land for a public purpose, it "shall consult the concerned Panchayat, Municipality or Municipal Corporation, as the case may be, at village level or ward level, in the affected area and carry out a Social Impact Assessment study in consultation with them".

A proviso to section 4(2) says the study shall be completed "within a period of six months from the date of its commencement." Another proviso asks for "adequate representation" of local bodies’ representatives during the study. Section 6 says the report is to be made available in the local language.

When it can be skipped. Section 9 says: "Where land is proposed to be acquired invoking the urgency provisions under section 40, the appropriate Government may exempt undertaking of the Social Impact Assessment study." Section 40(2) restricts urgency powers to "the minimum area required for the defence of India or national security or for any emergencies arising out of natural calamities or any other emergency with the approval of Parliament". Its proviso requires notice to the occupier before a building is taken.

Linear projects. Section 10 is headed "Special provision to safeguard food security". It limits the acquisition of irrigated multi-cropped land and other farmland. A proviso to section 10(4) says "the provisions of this section shall not apply in the case of projects that are linear in nature such as those relating to railways, highways, major district roads, irrigation canals, power lines and the like." That proviso sits in section 10. In our reading, it does not exempt these projects from the SIA in section 4. Some states have added exemptions. The copy we read shows Gujarat’s section 10A, letting the state "exempt any of the following projeCts from the application of the provisions of Chapter II and Chapter III of this Act". Chapter II covers the SIA.

Does the 2013 Act cover highways and railways?

Not in full. Section 105(1) says: "Subject to sub-section (3), the provisions of this Act shall not apply to the enactments relating to land acquisition specified in the Fourth Schedule." That Schedule lists 13 laws. They include the National Highways Act, 1956, the Railways Act, 1989, the Metro Railways (Construction of Works) Act, 1978 and the Electricity Act, 2003.

Compensation was extended to them. Section 105(3) told the Central Government to issue a notification within one year. It was to apply the First Schedule compensation rules to these laws. It was also to apply the Second and Third Schedule rehabilitation rules.

That notification was not issued, the 2015 order itself says. Ordinances followed from 31 December 2014. The 2019 Supreme Court ruling reproduces the 2015 order, the Removal of Difficulties Order, 2015. It says these provisions "shall apply to all cases of land acquisition under the enactments specified in the Fourth Schedule to the said Act." Its text, as reproduced, names only the First, Second and Third Schedules. It does not mention the SIA or consent rules.

The rulings we read date that order 28 August 2015. Its reproduced text says it came into force on 1 September 2015. A September 2026 ruling also mentions 19 September 2015. We did not read the Gazette copy, so we cannot settle the dates.

Highways have their own process. Under the National Highways Act, anyone interested in the land may object "within twenty-one days" of the notification (s. 3C(1)). The competent authority’s order on objections is "final" (s. 3C(3)). The amount is set by the competent authority (s. 3G(1)). If either side does not accept it, it is "determined by the arbitrator to be appointed by the Central Government" (s. 3G(5)).

What the Supreme Court has said about highway land. Each ruling below applies in its own terms.

  • Supreme Court, 19 September 2019, highway solatium ruling ((2019) 9 SCC 304). Two judges declared that the 1894 Act’s provisions "relating to solatium and interest contained in Section 23(1A) and (2) and interest payable in terms of section 28 proviso will apply to acquisitions made under the National Highways Act." Section 3J of the National Highways Act was, "to this extent", declared unconstitutional.
  • Supreme Court, 25 March 2026, review ruling (2026 INSC 291). A 2025 ruling (2025 SCC OnLine SC 235) had refused to make the 2019 ruling apply only to future cases. The 2026 ruling declined to revisit that 2025 ruling over a higher cost estimate. It said: "There is no gainsaying that the constitutional guarantee of just compensation cannot be rendered contingent upon the magnitude of the financial burden." It set limits by date (para 14).

Under those limits, landowners whose compensation claims were pending on or after 28 March 2008 may seek solatium and interest. If they claimed these only after that date, no interest is payable for the period of delay. Claims concluded before 28 March 2008 cannot be reopened. The directions do not let the highway authority or the Union recover solatium or interest already paid (para 17).

  • Supreme Court, 8 September 2026 (2026 INSC 973). Two judges decided which law governs solatium and interest on highway land. The test is whether the "award" came before or after 1 January 2015: "if before, the entitlement will be under the Act of 1894 and if after, under the Act of 2013." Under the highways law, the award is the competent authority’s amount under section 3G(1) (para 19). In that case it came earlier, so solatium, interest and interest on solatium were to be computed under the 1894 Act.

States have their own changes too. The copy we read shows a Tamil Nadu amendment adding its own list of laws (s. 105-A). It also shows a Maharashtra amendment to a section 105-A, citing a 2018 Maharashtra Amendment Act. We have not read Maharashtra’s amending Acts. Our Shaktipeeth Expressway report records a struggle committee’s allegation about "the 1955 law".

What happened to land acquired under the 1894 law?

Section 24 sets the rules for 1894 Act cases. If no award was made, the 2013 Act’s compensation rules apply (s. 24(1)(a)). If an award was made, the case continues under the 1894 Act (s. 24(1)(b)).

Section 24(2) adds a lapse rule. It covers cases where the award was made "five years or more prior to the commencement of this Act but the physical possession of the land has not been taken or the compensation has not been paid". Those proceedings "shall be deemed to have lapsed". The government may start again under the 2013 Act.

A proviso follows: "Provided that where an award has been made and compensation in respect of a majority of land holdings has not been deposited in the account of the beneficiaries, then, all beneficiaries specified in the notification for acquisition under section 4 of the said Land Acquisition Act, shall be entitled to compensation in accordance with the provisions of this Act."

Supreme Court, 6 March 2020, five judges, the Constitution Bench ruling on section 24 ((2020) 8 SCC 129). It overruled an earlier three-judge ruling on the same section. Its answers include:

  • "The word ‘or’ used in Section 24(2) between possession and compensation has to be read as ‘nor’ or as ‘and’." The court said a lapse takes place only where, due to the authorities’ inaction, possession was not taken and compensation was not paid.
  • Section 24(2) applies to proceedings "pending with concerned authority as on 1.1.2014". "The period of subsistence of interim orders passed by court has to be excluded in the computation of five years."
  • It said section 24 "does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition."

It also said: "The provisions of Section 101 cannot be applied to the acquisitions made under the Act of 1894." ((2020) 8 SCC 129.) Section 101 deals with land left unused for five years after possession. Such land "shall be returned to the original owner or owners or their legal heirs, as the case may be, or to the Land Bank of the appropriate Government by reversion in the manner as may be prescribed by the appropriate Government."

Attempts to change the 2013 Act. PRS says an ordinance to amend the 2013 Act was promulgated in December 2014. The Supreme Court’s March 2026 ruling says it extended the compensation framework to highway land from 1 January 2015. It adds that the ordinance "subsequently lapsed" (para 5.6). PRS shows the 2015 Second Amendment Bill introduced on 11 May 2015 and sent to a Joint Parliamentary Committee. Its last status there reads "Extn. upto last day of the Budget Session 2019". We could not confirm any later step.

What can a landowner do if the award is disputed?

This section only describes the steps in the Act. It is not advice. Time limits apply, and each case turns on its facts.

  • Objections before the award (s. 15). Any person interested may object "within sixty days from the date of the publication of the preliminary notification". Objections can cover the area and suitability of the land, the public purpose, and "the findings of the Social Impact Assessment report". The Collector hears them. The government’s decision on them "shall be final" (s. 15(3)).
  • Reference to the Authority (s. 64). A person who has not accepted the award may ask the Collector, in writing, to refer it. The objection can be to the measurement, the amount, who is paid, rehabilitation rights or the split among claimants. The Collector is to refer it within thirty days.
  • The Authority (s. 51). It is the Land Acquisition, Rehabilitation and Resettlement Authority. The Act sets it up "for the purpose of providing speedy disposal of disputes relating to land acquisition, compensation, rehabilitation and resettlement".
  • Appeal to the High Court (s. 74). A person aggrieved by the Authority’s award "may file an appeal to the High Court within sixty days from the date of Award". The High Court may allow up to sixty more days for "sufficient cause".
  • Civil courts (s. 63). No civil court may hear a dispute that the Collector or the Authority is empowered to decide. The High Court under Article 226 or 227, and the Supreme Court, are excepted.

Older cases follow the 1894 Act. A Free Press Journal report (page dated 26 August 2026) describes one from Madhya Pradesh. After the awards, landowners approached a court "under Section 18 of the Land Acquisition Act, 1894, which enhanced the compensation." The paper says the High Court later enhanced it further.

Highway land follows its own route to an arbitrator, as described above. For what the law says about protest itself, see our guide to rights at a protest.

Why do villagers protest?

The reasons below come from news reports and our live pages, each credited. They are examples, not a full list.

  • The rate. At a village meeting in Kachkanti, Telangana (the paper calls it a Gram Sabha), "Farmers demanded that the revenue officials give Rs 6 crore per acre as compensation", Deccan Chronicle reported on 10 September 2026. The land is for a proposed airport in Adilabad. "Officials said the rate would be fixed during the collector’s meeting with the farmers." The villagers also asked for airport jobs.
  • The same project’s SIA. On 7 September 2026 the same paper said officials were "conducting a social impact assessment to know how the project would affect the local communities socially, economically and culturally."
  • A revised rate. Officials said the Greater Noida authority had revised its rate to ₹6,415 per square metre, Hindustan Times reported on 29 August 2026. The paper also wrote: "Farmers have repeatedly protested for a hike in land compensation." Officials said the revision "would make land acquisition easier". The report also calls it a "purchase process". It does not name the law used.
  • Keeping farmland. The Hindu reported on 15 July 2025 that Karnataka had dropped the acquisition of 1,777 acres in Devanahalli for an aerospace park. The Chief Minister announced it after meeting farmers’ representatives. The paper said the farmers "had questioned the logic of acquiring fertile lands for industrial development."
  • It added: "The farmers ended their 1,198-day protest on Tuesday at Channarayapatna following the decision to drop the land acquisition process." On 4 December 2025 The Hindu reported the State Cabinet’s decision to drop it. Citing the state’s Law and Parliamentary Affairs Minister, the paper reported that the Karnataka Industrial Area Development Board "would not acquire the land under its provisions". The reports do not name the 2013 Act.
  • Rehabilitation before submergence. Families displaced by dams and a river link in Panna, Madhya Pradesh, cite section 38 of the 2013 Act, as our Panna dam oustees report records. A proviso to section 38(1) says that for irrigation or hydel projects, "the rehabilitation and resettlement shall be completed six months prior to submergence of the lands acquired."
  • Consent and which law is used. Our Shaktipeeth Expressway report records a struggle committee’s allegation, reported by Pudhari. It alleges that a 1955 law was chosen to avoid the 2013 Act’s consent rule. Our report found no government statement on the allegations.
  • The route, not the money. In Assam, six tribal organisations say compensation is not the issue and want a power line moved (The Assam Tribune, NE Now). See our Sonapur power line report. A separate body there asked for three times the land value (The Sentinel).

What a parliamentary committee said. The Standing Committee on Rural Development and Panchayati Raj presented a report on the 2013 Act on 18 December 2025. PRS Legislative Research summarises its observations. In the committee’s view, as PRS reports it:

  • "to reduce compensation, greenfield land is being classified as brownfield land and rural land is being covered as urban land."
  • On rehabilitation, it noted issues including "employment commitments remaining unmet".
  • It said the National Monitoring Committee had not been able to reduce grievances on projects such as Ken-Betwa River linking and Polavaram.

These are the committee’s observations, as PRS summarises them. We found no government response to them in the sources we read. For other farm protests, see our MSP guide. See also our Buxa Tiger Reserve report, where relocation and forest rights are in dispute.

Where to read the law and check current figures

Examples from our reports

These live reports involve land acquisition, compensation or rehabilitation. Each note follows the live page and names the outlets it cites.

  • Panna dam oustees, Madhya Pradesh: continuing as of 11 October reports. Families displaced by dams want full compensation and rehabilitation before their land is submerged (Dainik Bhaskar, The Hindu). The Collector told The Hindu that 1,219 of 1,450 displaced families have received Rs 5 lakh each. Protesters cite section 38 of the 2013 Act (PTI, Dainik Bhaskar).
  • Sonapur power line protests, Assam: ongoing. Six tribal organisations want a high-voltage line moved away from tribal land and say compensation is not the issue (The Assam Tribune, NE Now). A separate group asked for compensation of three times the land value instead of the prescribed rate, The Sentinel reports.
  • Shaktipeeth Expressway farmers, Maharashtra: ongoing. A struggle committee called statewide protests for 9 October over what it calls forced land measurement under police protection (Lokmat). The page found no report of how they went and no statement from the government on the allegations.
  • Sanjauli residents and highway tunnels, Shimla: as of 12 October, a rally was called for 16 October. The page reports a dispute over cracks in buildings above a highway tunnel. Owners asked for a compensation process (Amar Ujala). Himachal Scape reports a demand that cites land reportedly acquired, and compensation paid, on an earlier survey.
  • Thane Ring Metro residents, Maharashtra: ongoing. Residents object to tree felling, possible displacement and the route. The Municipal Commissioner said about 70% of the land needed is already available and rehabilitation will get priority (Moneycontrol citing News18).
  • Rewa villagers and a proposed nuclear plant, Madhya Pradesh: villagers stopped a team that came for borehole tests (Bhaskar Hindi, People’s Update, The Indian Express). The Rewa Collector told The Indian Express that no land has been allotted to Tata Power.

Frequently asked questions

Is land acquisition compensation always four times the market value?

No. Under the 2013 Act’s First Schedule, the rural factor is 1 to 2, "as may be notified by the appropriate Government". The urban factor is 1. Solatium then doubles the amount. So four times is reached only where a factor of 2 applies. The Act calls this "the minimum compensation package", shared with tenants in a proportion the government decides. States may pay more (s. 107). This is general information, not legal advice.

Is solatium 100% of the land price?

Section 30(1) says solatium is "equivalent to one hundred per cent. of the compensation amount". The First Schedule works it out on market value times the factor, plus the value of assets attached to the land.

Does every land acquisition need 80% consent?

No. Section 2(2) asks for 80% of affected families for private companies and 70% for public-private partnership projects, counting only the families it defines. PRS says: "No consent required for government projects." Scheduled Areas have a separate rule; see our PESA guide.

Does the 2013 Act apply to national highway land?

The National Highways Act is in the 2013 Act’s Fourth Schedule, so the 2013 Act does not apply in full. A 2015 order applied its compensation and rehabilitation schedules. Supreme Court rulings in 2019 and 2026 dealt with solatium and interest on highway land. Each applies in its own terms.

Is unused acquired land returned to the owner?

The 2013 Act, as printed, says in section 101 that land unused for five years after possession shall be returned to the original owners or heirs, "or to the Land Bank of the appropriate Government by reversion in the manner as may be prescribed by the appropriate Government." State laws can change this period. Karnataka changed it in 2019: there it is "a period specified for setting up of any project or for five years, whichever is later," (Karnataka Act 16 of 2019, s. 11). The Supreme Court said in 2020 that section 101 cannot be applied to acquisitions under the 1894 Act.

What does the Act say about disputed awards?

The 2013 Act lets a person who has not accepted the award ask the Collector to refer it to the Authority (s. 64). An appeal against the Authority’s award lies to the High Court within sixty days (s. 74). This describes the Act; it is not legal advice.

This guide is general information, not legal advice. Laws, state notifications and court rulings change, and courts decide each case on its facts. States have amended the 2013 Act in different ways. For advice on a real situation, speak to a lawyer. Correction, 31 October 2026: our answer on unused acquired land gave the 2013 Act’s five-year rule as if it applied everywhere; it now says state laws can change the period and that Karnataka changed it in 2019.

Last checked 15 October 2026.

Sources

Accessed 15 October 2026. The tag shows how much of each source we read: in full, only in part (for example a paywalled or cut-off article), or not at all.

  1. Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Indian Kanoon; its note says the content "could not be verified"). Partly read Sections 2, 3(c), (e), (f), (g), (k), (u), (za), 4, 9, 10, 15, 24, 26, 27, 30, 31, 38, 40, 51, 63, 64, 74, 101, 105 and 114, and the First and Fourth Schedules read.
  2. National Highways Act, 1956 (Indian Kanoon). Partly read Sections 3A to 3J read.
  3. Constitution of India, Article 300A (Indian Kanoon). Read in full
  4. Supreme Court (five judges), the Constitution Bench ruling on section 24, (2020) 8 SCC 129 (Indian Kanoon), 6 March 2020. Partly read Opening paragraphs, the passages on section 101 and on overruling, and the nine answers read.
  5. Supreme Court, highway solatium ruling, (2019) 9 SCC 304 (Indian Kanoon), 19 September 2019. Partly read The opening, the reproduced 2015 order, the declaration on solatium and interest, and the closing grounds read.
  6. Supreme Court, review ruling on highway solatium and interest, 2026 INSC 291 (Indian Kanoon), 25 March 2026. Read in full
  7. Supreme Court, which law sets highway solatium and interest, 2026 INSC 973 (Indian Kanoon), 8 September 2026. Read in full
  8. PRS Legislative Research, the 2015 Second Amendment Bill to the 2013 Act (bill page). Partly read Status line, highlights, context and Table 1 read.
  9. PRS Legislative Research, summary of the Standing Committee on Rural Development and Panchayati Raj report on the 2013 Act, 18 December 2025 (report presented). Read in full
  10. Oxford Learner’s Dictionaries, "compensation". Read in full
  11. Oxford Learner’s Dictionaries, "collector". Read in full
  12. The Hindu, "Devanahalli land row: Karnataka govt drops acquisition of 1,777 acres of agriculture land", 15 July 2025 (updated 16 July 2025). Read in full
  13. The Hindu, "Cabinet decides to drop farmland acquisition at Devanahalli", 4 December 2025. Read in full
  14. Hindustan Times, "Greater Noida hikes farmers’ land compensation to ₹6,415 per sqm", 29 August 2026. Read in full
  15. Deccan Chronicle, "Revenue Teams Plan Gram Sabhas From Sept 9 In Villages Listed For Adilabad Airport Project", 7 September 2026. Read in full
  16. Deccan Chronicle, "Land For Airport: First Gram Sabha Held In Kachkanti Village", 10 September 2026. Read in full
  17. Free Press Journal, "MP High Court Rejects Transco Pleas Against Enhanced Land Acquisition Compensation", 26 August 2026. Read in full The page says updated 26 August 2026, 11:21 pm IST; its metadata gives 27 August 2026.
  18. Dainik Bhaskar, Bhaskar Hindi, People’s Update, The Assam Tribune, NE Now, PTI, The Sentinel, Pudhari, Lokmat, Amar Ujala, Himachal Scape, Moneycontrol, News18 and The Indian Express, as cited by our live reports. Not read Named only as our live reports cite them.
  19. India Code copy of the 2013 Act (timed out); the Gazette copy of the 2015 Removal of Difficulties Order; states’ rural factor notifications; the Land Acquisition Act, 1894; the Karnataka Industrial Areas law; the Maharashtra 1955 highways law; the committee’s full report; the text of the 2015 Bill. Not read Points from these are given only as the sources above report them.

Spotted an error, or a source we missed? Email a correction with the source that shows it. See how we handle corrections. Back to top