Guide
What is an NOC for a project? Panchayat NOCs, consent to establish and who issues them
What an NOC is Consent to establish Consent to operate Exemptions Environmental clearance Panchayats At a glance Disputes Unconfirmed Our reports FAQ Sources
Short answer
“NOC” (no-objection certificate) is an everyday name; the pollution laws we read do not use it. Under the Water and Air Acts, some industries and plants need the state pollution board’s “previous consent”, called consent to establish. In Union territories, the Central Board acts and may delegate. Panchayat permissions come from state law. Environmental clearance is separate.
This guide is general information, not legal advice. It describes which permission comes from which body under which law, as the texts we read print them. It does not tell anyone what to do, and it does not say whether any project is lawful. Rules differ by state and by type of project. We read the sources on 27 October 2026.
What is an NOC for a project?
"NOC" stands for no-objection certificate. People use it for many different permissions. The two pollution laws we read never use the words "no-objection certificate" or "NOC". They speak of the "previous consent of the State Board".
Some official bodies and outlets use "NOC" for that consent. The State Pollution Control Board of Odisha says on its website:
As per provisions of Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981 all new intending projects (Developmental & Industrial) are required to obtain “Consent to Establish”(popularly termed as NOC) from State Pollution Control Board.
Other bodies use the same word for their own permissions. One of our live reports, for example, describes a maritime board’s "conditional no-objection certificate" (see the examples below). So an "NOC" can come from different bodies under different laws. The name alone does not say which.
Is there one law for project NOCs?
We read no single law that creates one "project NOC". We searched the Indian Kanoon copies of the Water and Air Acts. We also searched the 2024 Water amendment and the Madhya Pradesh panchayat Act, and read section 233 of Kerala’s Act in full. Each permission we found comes from its own law and its own body. The sections below take the main ones in turn.
What is consent to establish, and who issues it?
It is the State Pollution Control Board’s permission before a plant is set up. The term itself is not in the Acts. It is the name boards and the Centre use, as the quotes on this page show. The Water (Prevention and Control of Pollution) Act, 1974 says in section 25(1):
Subject to the provisions of this section, no person shall, without the previous consent of the State Board,— (a) establish or take any steps to establish any industry, operation or process, or any treatment and disposal system or any extension or addition thereto, which is likely to discharge sewage or trade effluent into a stream or well or sewer or on land (such discharge being hereafter in this section referred to as discharge of sewage); or (b) bring into use any new or altered outlet for the discharge of sewage; or (c) begin to make any new discharge of sewage:
A proviso follows; we do not quote it.
We read this section on Indian Kanoon. That copy shows the text before 2024 and may be out of date. Under section 25(4), the Board "may" grant consent with conditions, or "refuse such consent for reasons to be recorded in writing."
The Air (Prevention and Control of Pollution) Act, 1981 has a similar rule in section 21(1). The Jan Vishwas (Amendment of Provisions) Act, 2023 (No. 18 of 2023) replaced that sub-section with:
(1) No person shall establish or operate any industrial plant in an air pollution control area unless the previous consent of the State Board has been obtained in pursuance of an application made by such person in accordance with the provisions of this section:
Provided that the Central Government may in consultation with the Central Pollution Control Board, by notification in the Official Gazette, exempt certain categories of industrial plants from the application of the provisions of this sub-section.
The same Act added section 21A, which lets the Centre issue guidelines on consent. Section 1(2) of the 2023 Act says: "It shall come into force on such date as the Central Government may, by notification in the Official Gazette, appoint; and different dates may be appointed for amendments relating to different enactments mentioned in the Schedule." We did not read the notice that started the Air Act changes. The Indian Kanoon copy of the Air Act we read still shows the older text.
Note the words "in an air pollution control area". Under section 19(1), the State Government declares these areas:
The State Government may, after consultation with the State Board, by notification in the Official Gazette, declare in such manner as may be prescribed, any area or areas within the State as air pollution control area or areas for the purposes of this Act.
So the Air Act rule reaches only plants in such an area. The Water Act rule turns on likely discharges of sewage or trade effluent. Both sections name the "State Board".
Union territories differ. Section 4(4) of the Water Act says:
Notwithstanding anything contained in this section, no State Board shall be constituted for a Union territory and in relation to a Union territory, the Central Board shall exercise the powers and perform the functions of a State Board for that Union territory:
Provided that in relation to any Union territory the Central Board may delegate all or any of its powers and functions under this sub-section to such person or body of persons as the Central Government may specify.
The 2024 notifications below name "the State Pollution Control Boards or the Pollution Control Committees". We did not read the orders that set up those committees.
What if the pollution board does not reply?
The two Acts differ here. The Water Act copy we read has a deemed-consent clause, section 25(7):
The consent referred to in sub-section (1) shall, unless given or refused earlier, be deemed to have been given unconditionally on the expiry of a period of four months of the making of an application in this behalf complete in all respects to the State Board.
We searched the whole 2024 amendment for section 25. It changes the proviso to section 25(1), not section 25(7). The Air Act copy we read sets a four-month period in section 21(4):
Within a period of four months after the receipt of the application for consent referred to in sub-section (1), the State Board shall, by order in writing, and for reasons to be recorded in the order, grant the consent applied for subject to such conditions and for such period as may be specified in the order, or refuse such consent:
A proviso on cancelling consent follows; we do not quote it.
We read no clause in section 21 that deems a new application granted. A proviso to section 21(2) covers plants already running when an area is declared. It treats them as running with consent until consent is refused, if they apply in time.
Newer guidelines add a separate deemed rule for some small units. A Gazette notice of 23 January 2026 (G.S.R. 63(E)) amends the Water Act consent guidelines. It is made under section 27A, which the 2024 Water amendment inserted. That amendment applies only in some states and the Union territories (see below). The Environment Ministry’s press release of 28 January 2026 says: "For such units, Consent to Establish is deemed granted upon submission of a self-certified application, as the land has already been assessed from an environmental perspective." The release says "such units" are Micro and Small Enterprises in notified industrial estates or areas.
What is the difference between consent to establish and consent to operate?
The names point to two stages: setting up a plant, and running it. The Acts as we read them do not use either name. The Centre’s guidelines do. The same 2026 notice, made under section 27A of the Water Act, says in paragraph 4(3):
Once granted, the consent to operate shall continue to remain valid till it is cancelled in accordance with the provisions of paragraph 13 of these guidelines
The press release of 28 January 2026 puts it this way: "Under the amended guidelines, CTO, once granted, will remain valid until it is cancelled." We did not read the matching guidelines under the Air Act. The Water Act guidelines rest on section 27A, so their reach follows the 2024 amendment’s limits, set out below.
Does every factory need consent to establish?
No. Two notifications exempt some plants. The next section covers where the Water Act one applies. G.S.R. 702(E) (Air Act) and G.S.R. 703(E) (Water Act), both dated 12 November 2024, exempt two groups. The first is:
all industrial plants having pollution index score upto 20 as listed in the Schedule to this notification, subject to condition that such plant shall inform in writing to the State Pollution Control Boards or the Pollution Control Committees;
The Schedule lists sectors under the heading "LIST OF WHITE CATEGORY OF SECTORS CLASSIFIED BY CPCB FROM TIME TO TIME". The second group is:
all industrial plants which have obtained prior environmental clearance as per the notification of the Government of India in the erstwhile Ministry of Environment and Forests number S.O. 1533(E), dated the 14th September, 2006 issued under the Environment (Protection) Act, 1986 (29 of 1986), in respect of previous consent to establish such plant.
So the second exemption covers only the consent to establish, and only for plants that already hold environmental clearance. In a Lok Sabha reply published by PIB on 3 February 2025, the Environment Ministry said:
Consequently, notifications [G. S. R. 702 (E) dated 12-11-2024 under section 21(1) of the Air Act and G. S. R. 703 (E) dated 12-11-2024 under section 25(1) of the Water Act] have been issued to exempt white category of industries completely from consent mechanism and other categories from Consent to Establish if the project or activity has obtained environmental clearance under the Environmental (Protection) Act, 1986.
The reply says "completely". The notification attaches a condition: the plant "shall inform in writing" the board. The same reply adds: "Also, the existing mechanism of ‘Consent to Operate’ will continue as such and the SPCBs will continue to regulate and monitor the potential environmental implications by projects through the mechanism of Consent to Operate."
Do the 2024 changes apply in every state?
Not the Water Act changes, as the 2024 Act is written. The Water (Prevention and Control of Pollution) Amendment Act, 2024 (No. 5 of 2024) replaced the proviso to section 25(1) with this:
Provided that the Central Government may in consultation with the Central Board, by notification in the Official Gazette, exempt certain categories of industrial plants from the provisions of this sub-section.
G.S.R. 703(E) uses that proviso. But section 1(2) of the 2024 Act limits where it applies:
It applies, in the first instance, to the whole of the States of Himachal Pradesh and Rajasthan and the Union territories; and it shall apply to such other State which adopts this Act by resolution passed in that behalf under clause (1) of article 252 of the Constitution read with clause (2) thereof.
The Hindu reported on 20 August 2026 that Andhra Pradesh’s Legislative Assembly "passed a resolution for adoption" of the 2024 Act. We did not find an official list of every state that has adopted it.
The Air Act exemption, G.S.R. 702(E), says it uses "the proviso to sub-section (1) of section 21" of the Air Act. That is the proviso the 2023 Jan Vishwas Act added, quoted above. Section 1 of the 2023 Act, as we read it, names no list of states.
Is consent to establish the same as environmental clearance?
No. They are separate permissions under separate laws, according to a Rajya Sabha reply published by PIB on 19 December 2024. It says:
The projects or activities covered in the schedule of the EIA, Notification, 2006, are required to obtain prior environmental clearance.
The reply goes on:
Further Consent to Establish (CTE) / Consent to Operate (CTO) is also granted by the State Pollution Control Boards under the provisions of the Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981, as amended, and applicable.
The PIB reply of 3 February 2025 places environmental clearance under the Environment (Protection) Act, 1986 and the EIA Notification, 2006. Our guide to the EIA public hearing explains the public hearing step. The 2024 exemption above links the two processes for some plants. It does not make them one permission.
What is a panchayat NOC, and where does its power come from?
A panchayat’s powers come from state law. Article 243G of the Constitution lets each state decide them. The Indian Kanoon copy we read prints it this way:
Subject to the provisions of this Constitution the Legislature of a State may, by law, endow the Panchayats with such powers and authority and may be necessary to enable them to function as institutions of self-government and such law may contain provisions for the devolution of powers and responsibilities upon Panchayats, at the appropriate level, subject to such conditions as may be specified therein, with respect to-- (a) the preparation of plans for economic development and social justice; (b) the implementation of schemes for economic development and social justice as may be entrusted to them including those in relation to the matters listed in the Eleventh Schedule.
The article goes on to list plans and schemes for economic development and social justice. So what a panchayat may permit, and what it calls that permission, differs from state to state. We read two state Acts.
Kerala. Section 233(1) of the Kerala Panchayat Raj Act, 1994 says:
No person shall, without the permission of the village panchayat and except in accordance with the conditions specified in such permission, - (a) construct or establish any factory, workshop or workplace in which it is proposed to employ steam power, water power or other mechanical power, or electrical power; or (b) install in any premises any machinery or manufacturing plant driven by any power as aforesaid, not being machinery or manufacturing plan exempted by the provisions of this Act or the rules made there under.
The section says "permission", not NOC. Under section 233(3), the panchayat decides "within sixty days". Under section 233(4), it first obtains reports, including one from the Inspector of Factories or an Industries Department officer. This is Kerala’s law only. We did not check whether our copy is current.
Madhya Pradesh. Section 54 of the Madhya Pradesh Panchayat Raj Avam Gram Swaraj Adhiniyam, 1993 gives the Gram Panchayat power, "Subject to the rules as the State Government may make in this behalf", among other things:
to regulate establishment of workshops, factories and other industrial units;
Section 55(1) covers buildings:
Subject to the provisions of this section no person shall erect any building or alter or add to any existing building or reconstruct any building without the permission in writing of the Gram Panchayat and except in accordance with bye-laws made in this behalf under this Act. Permission shall be presumed to have been granted if no refusal of such permission is communicated by the Gram Panchayat within forty five days of the receipt of the application.
We searched the whole Indian Kanoon copy for "objection". We found no section giving the Gram Panchayat or the gram sabha a power to issue a no-objection certificate for projects. The only no-objection certificate we found is a Collector’s certificate about electricity and water connections. This is true of the copy we read; we did not check whether it is current.
Does a project need gram sabha consent?
It depends on the law and the place. Article 243(b) of the Constitution says:
‘Gram Sabha’ means a body consisting of persons registered in the electoral rolls relating to a village comprised within the area of Panchayat at the village level;
In the Madhya Pradesh Act we read, section 7 gives the gram sabha power to:
approve all plans including Annual Plans, programmes and projects for social and economic development before such plans, programmes and projects are taken up for implementation by the Gram Panchayat;
Those are plans and projects that the Gram Panchayat itself takes up. For Scheduled Areas, our guide to PESA and gram sabha consent explains when the law says "consulted" and when it says "consent". We do not repeat it here.
Which body gives which permission?
The table sets out only the permissions in the texts we read. A project may need others, such as land, forest or building approvals. Each cell quotes or follows its source.
| Permission | Who gives it | What the text covers | Source |
|---|---|---|---|
| Consent under the Water Act (boards call it consent to establish) | The "State Board" | Any industry, operation or process "likely to discharge sewage or trade effluent", among other things | Water Act 1974, section 25(1) |
| Consent under the Air Act | The "State Board" | Any industrial plant "in an air pollution control area" | Air Act 1981, section 21(1) |
| Environmental clearance | Not named in the reply we read | Projects "covered in the schedule of the EIA, Notification, 2006" | Rajya Sabha reply, PIB, 19 December 2024 |
| Water Act consent in a Union territory | The "Central Board", which may delegate its powers | The powers and functions of a State Board for that Union territory | Water Act 1974, section 4(4) |
| Permission for factories and powered machinery (Kerala only) | The "village panchayat" | Factories, workshops or workplaces using power, and powered machinery | Kerala Panchayat Raj Act 1994, section 233(1) |
| Building permission (Madhya Pradesh only) | The "Gram Panchayat" | Erecting, altering or rebuilding a building | MP Panchayat Raj Avam Gram Swaraj Adhiniyam 1993, section 55(1) |
What happens when people dispute a permission?
The reports we read show three different kinds of dispute. Each is described in the outlet’s own words.
A board cancels a consent (Punjab). Hindustan Times reported on 2 May 2026 on a cement firm’s consent to establish in Sangrur district. HT wrote:
The Punjab pollution control board (PPCB) has cancelled the consent to establish (NOC) granted to Shree Punjab Cement Plant to establish a grinding unit over 47.82 acres of land in Deh Kalan village of Sangrur, following the Supreme Court’s order.
HT says it followed a Supreme Court judgment of 13 February that "quashed the project’s land-use clearances". HT quotes the board’s letter of 28 April:
In view of the above facts, the industry is hereby directed not to undertake any development or construction activity related to the project at village Deh Kalan, Tehsil & District Sangrur in reference to the consent to establish (NOC) dated 14.12.2021, which stands set aside by the Hon’ble Supreme Court of India and cancelled by the Punjab Pollution Control Board.
Note that the letter, as HT quotes it, writes "consent to establish (NOC)". We did not read the Supreme Court judgment.
Community consent questioned (Meghalaya). The Shillong Times reported on 25 October 2026 on a coke factory at Rajaju village in South West Khasi Hills. It wrote:
The protesters claimed that M/S HRT Coke Factory was built without the knowledge of the citizens or the consent of the general durbar of Hima Langrin.
The paper says two of the groups’ leaders alleged that the Syiem of Hima Langrin "granted permission for the project without conducting a public hearing". It adds:
Following the meeting, the deputy commissioner reportedly promised to stop all ongoing construction work at the site and ordered an inquiry into the matter.
We found no report of the inquiry’s result.
A forgery allegation at a hearing (Punjab). The Tribune reported on 6 July 2026 on a public hearing about a proposed cement plant. The Punjab Pollution Control Board held it at Har Raipur village, Bathinda. It wrote:
A former village sarpanch also alleged that his signatures had been forged on the related documents.
That is an allegation, and the report does not say it was tested. The paper also wrote:
At the end of the hearing, participants raised their hands to register their opposition, and their objections were recorded in the official register maintained by the PPCB.
The report does not say which approval the hearing was for. A district official, the paper says, "assured that no violations of environmental laws or other rules would be allowed during the establishment of any industry".
What could we not confirm?
- Which states have adopted the Water (Prevention and Control of Pollution) Amendment Act, 2024. So we cannot say where G.S.R. 703(E) applies.
- The date the 2023 changes to the Air Act, section 21, came into force. We did not read that notice.
- The Air Act consent guidelines and their amendments.
- Whether our copies of the Kerala and Madhya Pradesh Acts are current.
- Panchayat laws in other states. We read only Kerala’s and Madhya Pradesh’s.
- Which law the Manori maritime board NOC was issued under. Our live page does not say.
Examples from our reports
We link one live report where an "NOC" from a body other than a panchayat or pollution board appears. That page was last updated on 23 October 2026. Its status line still reads "March planned 19 October". It may be out of date. See also our guide to PESA and gram sabha consent. See also our guide to the EIA public hearing and our guide to officials entering land for a survey.
- Manori desalination plant protest, Mumbai: on 29 September, the page says, fishers’ representatives raised "the Maharashtra Maritime Board's conditional no-objection certificate (NOC)". The page credits Free Press Journal and Mid-Day. It does not say which law the NOC was issued under.
Frequently asked questions
Is an NOC the same as consent to establish?
Sometimes people use the two names for the same thing. Odisha’s pollution board says consent to establish is "popularly termed as NOC". But "NOC" is also used for permissions from other bodies, such as a maritime board. The Water and Air Acts we read use neither name.
Who issues consent to establish: the Centre or the state?
The Water Act, section 25(1), and the Air Act, section 21(1), both name the "State Board". In a Union territory, the Water Act gives that role to the Central Board, which may delegate it; notices name Pollution Control Committees. The Centre issues exemptions and guidelines, such as G.S.R. 702(E) and 703(E) of 12 November 2024.
Does every project need a panchayat NOC?
We read no law that says so. Panchayat powers come from state law (Article 243G). Kerala’s Act requires the village panchayat’s "permission" for factories using power. The Madhya Pradesh Act we read gives no no-objection-certificate power for projects.
Is consent to establish a form of environmental clearance?
No. A Rajya Sabha reply of 19 December 2024 describes environmental clearance under the EIA Notification, 2006. It says consent to establish and consent to operate are "also granted" by state boards under the Water and Air Acts.
What happens if a pollution board does not decide in time?
Under the Water Act copy we read, section 25(7) deems consent given after four months of a complete application. We read no such clause in the Air Act’s section 21.
Is this legal advice?
No. This is general information, not legal advice. It describes the sources we read and does not say what anyone should do.
This guide is general information, not legal advice. It draws on the Water and Air Acts, the 2024 Water amendment, the Jan Vishwas (Amendment of Provisions) Act, 2023 and notifications of 2024 and 2026. It also uses three PIB releases, the Constitution and two state panchayat Acts. It also draws on one pollution board page and four news reports. Each source is dated and credited. Rules differ by state and change over time. It takes no side on any government, company, panchayat, villagers or party.
Last checked 27 October 2026.
Sources
Accessed 27 October 2026. The tag shows how much of each source we read: in full, only in part (for example a paywalled or cut-off article), or not at all.
- The Water (Prevention and Control of Pollution) Act, 1974, Section 25 (Indian Kanoon copy), 1974. Read in full Section 25 read in full by the writer. The copy shows the text before the 2024 amendment.
- The Water (Prevention and Control of Pollution) Act, 1974 (Indian Kanoon copy), 1974. Partly read Whole copy searched by the writer for "no-objection", "NOC", "consent to establish" and "consent to operate" (no hits); section 4(4) read. Pre-2024 text.
- The Jan Vishwas (Amendment of Provisions) Act, 2023 (No. 18 of 2023), Gazette of India (Bihar State Pollution Control Board copy), 11 August 2023. Partly read Section 1 and the Air Act entry (section 21) read by the writer.
- The Air (Prevention and Control of Pollution) Act, 1981, Section 21 (Indian Kanoon copy), 1981. Read in full Section 21 read in full by the writer. The copy predates the 2023 change to section 21(1); we quote section 21(4) from it.
- The Air (Prevention and Control of Pollution) Act, 1981 (Indian Kanoon copy), 1981. Partly read Section 19 read; whole copy searched for "no-objection" and "NOC" (no hits).
- The Water (Prevention and Control of Pollution) Amendment Act, 2024 (No. 5 of 2024), Gazette of India, 15 February 2024. Partly read Sections 1 to 7 read by the writer; the whole text searched for section 25.
- Ministry of Environment, Forest and Climate Change, Notification G.S.R. 702(E) (Air Act), Gazette of India (PIB copy), 12 November 2024. Read in full Read in full by the writer, with its Schedule.
- Ministry of Environment, Forest and Climate Change, Notification G.S.R. 703(E) (Water Act), Gazette of India (PIB copy), 12 November 2024. Read in full Read in full by the writer, with its Schedule.
- PIB, "PARLIAMENT QUESTION: Changes in Environmental Clearances Policy", 3 February 2025. Read in full Read in full by the writer.
- PIB, "Parliament Question:- Removing dual compliance of EC and CTE", 19 December 2024. Read in full Read in full by the writer.
- PIB, "Government amends Uniform Consent Guidelines under Air and Water Acts to Streamline Approvals, Reduce Delays and Strengthen Environmental Compliance", 28 January 2026. Read in full Read in full by the writer.
- Ministry of Environment, Forest and Climate Change, Notification G.S.R. 63(E), Control of Water Pollution (Grant, Refusal or Cancellation of Consent) Amendment Guidelines, 2026 (PIB copy), 23 January 2026. Partly read English text, paragraphs 1 to 4, read by the writer.
- Constitution of India, Article 243 (Indian Kanoon copy). Read in full Read in full by the writer.
- Constitution of India, Article 243G (Indian Kanoon copy). Read in full Read in full by the writer. The copy prints "and may be necessary"; we quote it as printed.
- Kerala Panchayat Raj Act, 1994, Section 233 (Indian Kanoon copy), 1994. Read in full Read in full by the writer. We did not check whether the copy is current.
- The M.P. Panchayat Raj Avam Gram Swaraj Adhiniyam, 1993 (Indian Kanoon copy), 1993. Partly read Sections 7, 54 and 55 read by the writer; the whole copy searched for "objection". Currency not checked.
- State Pollution Control Board, Odisha, "Consent to Establish". Read in full Read in full by the writer. The page shows no date.
- Hindustan Times, "Following SC order, PPCB cancels cement firm’s permits for Sangrur unit", 2 May 2026. Read in full Read in full by the writer.
- The Shillong Times, "Hima Langrin locals demand demolition of ‘illegal’ coke factory", 25 October 2026. Read in full Read in full by the writer.
- The Tribune, "Villagers, environmental activists oppose proposed cement plant during public hearing in Bathinda village", 6 July 2026. Read in full Read in full by the writer.
- The Hindu, "Andhra Pradesh Assembly adopts Central amendment Act on water pollution", 20 August 2026. Read in full Read in full by the writer.
- The Free Press Journal and Mid-Day reports cited on our Manori page. Not read Named only as our live page credits them.
- The Supreme Court judgment of 13 February (year not stated by HT) on the Sangrur project; the notice starting the 2023 Air Act changes; the Air Act consent guidelines; state adoptions of the 2024 Water amendment; panchayat Acts of other states. Not read Not found or not read; no claim rests on them.
Spotted an error, or a source we missed? Email a correction with the source that shows it. See how we handle corrections. Back to top