EIA public hearing: what it is and how people can object

What it is Exemptions Notice Who presides Skipping After 2020 draft Objecting Our reports FAQ Sources

Short answer

An EIA public hearing is held at or near a project site to hear the concerns of local affected people. It is one part of public consultation; written responses are the other. The 30 days is a minimum notice period, not the hearing’s length. Not every project needs one: the EIA Notification, 2006 lists exemptions.

This guide is general information, not legal advice. It describes what the EIA Notification, 2006, its amendments, two Acts and one court ruling say about public hearings. It does not take any side or tell anyone what to do. We describe the texts as we read them on 18 October 2026.

Protests over mines, plants and roads often mention a "public hearing". This guide explains the hearing in the environmental clearance process. It quotes the rules and names the paragraph for each line.

Related guides: our guide to dam-displacement protests, our PESA and gram sabha guide, and our land acquisition compensation guide.

What is an EIA public hearing?

The rule book. The rules are in the Environment Impact Assessment Notification, 2006 (S.O. 1533(E), 14 September 2006). The Centre issued it under section 3 of the Environment (Protection) Act, 1986, its preamble says.

Section 3(2)(v) of that Act lets the Centre take measures on the "restriction of areas in which any industries, operations or processes or class of industries, operations or processes shall not be carried out or shall be carried out subject to certain safeguards".

Environmental clearance. Paragraph 2 of the notification says projects listed in its Schedule "shall require prior environmental clearance". That clearance must come "before any construction work, or preparation of land by the project management except for securing the land, is started on the project or activity".

The Schedule to the EIA Notification is headed "LIST OF PROJECTS OR ACTIVITIES REQUIRING PRIOR ENVIRONMENTAL CLEARANCE".

Regulatory authority. Paragraph 2 names it. It is "the Central Government in the Ministry of Environment and Forests for matters falling under Category ‘A’ in the Schedule". At State level it is "the State Environment Impact Assessment Authority (SEIAA) for matters falling under Category ‘B’". A district authority handles "Category ‘B2’ for mining of minor minerals". The copy’s footnote says the NGT suspended this 2016 wording in December 2018; an appeal is pending in the Supreme Court.

Public consultation. Paragraph 7(i) III(i) defines it:

"Public Consultation" refers to the process by which the concerns of local affected persons and others who have plausible stake in the environmental impacts of the project or activity are ascertained with a view to taking into account all the material concerns in the project or activity design as appropriate.

Two parts. Paragraph 7(i) III(ii) says public consultation "shall ordinarily have two components":

  • "(a) a public hearing at the site or in its close proximity- district wise, to be carried out in the manner prescribed in Appendix IV, for ascertaining concerns of local affected persons;"
  • "(b) obtain responses in writing from other concerned persons having a plausible stake in the environmental aspects of the project or activity."

So the hearing is one part of public consultation. Written responses are the other part.

In Hindi. The Hindi text of the 2022 amendment (S.O. 2163(E)) calls the public hearing jan sunvai (जन सुनवाई). It calls environmental clearance paryavaran anapatti (पर्यावरण अनापत्ति).

Which text we read. We read the Ministry’s consolidated copy "AS AMENDED UP TO JULY 2026", on the PARIVESH portal. Its disclaimer says the Gazette text "shall prevail" if there is a discrepancy. It also says Office Memoranda are not included. We also read the 2022 amendment in the Gazette.

Does every project need one?

No. Paragraph 7(i) III(i) says: "All Category ‘A’ and Category B1 projects or activities shall undertake Public Consultation, except the following". Paragraph 2 sets the clearance rule for projects "listed in the Schedule to this notification".

Paragraph 7(i) I(A) splits Category B: "The projects requiring an Environmental Impact Assessment report shall be termed Category ‘B1’ and remaining projects shall be termed Category ‘B2’ and will not require an Environment Impact Assessment report." The list of projects that need no public consultation is in paragraph 7(i) III(i). The July 2026 copy lists:

  • (a) "modernization of irrigation projects (item 1(c) (ii) of the Schedule)";
  • (b) "all projects or activities located within industrial estates or parks (item 7(c) of the Schedule) approved by the concerned authorities, and which are not disallowed in such approvals";
  • (c) "expansion of Roads and Highways (item 7 (f) of the Schedule) which do not involve any further acquisition of land";
  • (cc) "maintenance dredging provided the dredged material shall be disposed within port limits";
  • (d) "All Building or Construction projects or Area Development projects (which do not contain any category ‘A’ projects and activities) and Townships (item 8 (a) and 8(b) in the Schedule to the notification)."
  • (e) "all Category ‘B2’ projects and activities";
  • (f) "all projects or activities concerning national defence and security or involving other strategic considerations as determined by the Central Government";
  • (g) "all linear projects such as Highways, pipelines, etc., in border States";
  • (h) "all standalone pelletization plants, which were in existence and in operation on or before the 27th day of May, 2014 and have valid consent to establish and consent to operate from the concerned State Pollution Control Board or the Union Territory Pollution Control Committee."

The copy’s footnotes date (cc) to 2009, (g) to February 2015 and (h) to September 2015. They say (d) was substituted in February 2020.

Re-applications. A 2021 paragraph (7(i) II(x)) covers a fresh application after a clearance expired. The expert committee "may exempt the requirement of public hearing" if the project "has been implemented not less than fifty percentage in its physical form or construction".

We do not say whether any project in the news needed a hearing. That depends on its category and the exemptions, which our reports do not set out.

How much notice is given?

Appendix IV, paragraph 3.1, says: "A minimum notice period of 30 (thirty) days shall be provided to the public for furnishing their responses". So 30 days is a minimum, not a fixed figure, and it is a notice period, not the hearing’s length.

The advertisement must tell people where they can see the draft EIA report and its summary (3.2). "In places where the newspapers do not reach", the authority "should arrange to inform the local public about the public hearing by other means such as by way of beating of drums as well as advertisement / announcement on radio / television".

The summary report goes out "in English and in the official language of the state / local language" (2.2).

Postponement. Paragraph 3.3 allows none "unless some untoward emergency situation occurs", and then only on the District Magistrate’s recommendation. Since the 2022 amendment, a rescheduled hearing needs "a minimum notice period of fifteen days" (3.3(a)).

The 45 days. This is a time limit for the State Pollution Control Board to finish the hearing, counted from the applicant’s request letter (7.1). It is not a deadline for the public.

Steps in Appendix IV of the EIA Notification, 2006, as printed in the July 2026 consolidated copy
StepWhat the text saysWhere
RequestThe applicant asks the Member Secretary of the State Pollution Control Board "through a simple letter" to arrange the hearing.Appendix IV, 2.1
Date and noticeThe Board fixes the date within 7 days and advertises it in a national daily and a regional daily. "A minimum notice period of 30 (thirty) days shall be provided to the public for furnishing their responses".Appendix IV, 3.1
After a postponement"a minimum notice period of fifteen days" before the new date, and not less than forty-five days from the first advertisement.Appendix IV, 3.3(a), added by S.O. 2163(E), 9 May 2022
Quorum"There shall be no quorum required for attendance for starting the proceedings."Appendix IV, 6.2
Record"The SPCB or UTPCC shall arrange to video film the entire proceedings."Appendix IV, 5.0
Time limit for the Board"The public hearing shall be completed within a period of 45 (forty five days from date of receipt of the request letter from the Applicant."Appendix IV, 7.1

Every cell quotes or summarises the paragraph named in its row. SPCB means State Pollution Control Board; UTPCC means Union Territory Pollution Control Committee.

Who runs the hearing and can anyone speak?

Who runs it. Paragraph 7(i) III(iii) says the hearing "in all cases shall be conducted by the State Pollution Control Board (SPCB) or the Union Territory Pollution Control Committee (UTPCC) concerned".

Who presides. The 2022 amendment (S.O. 2163(E)) changed paragraph 4.0 of Appendix IV. The current text reads:

The District Magistrate / District Collector / Deputy Commissioner or his or her representative not below the rank of an Additional District Magistrate or any other District Level Officer authorised by him or her in this behalf assisted by a representative of SPCB or UTPCC, shall supervise and preside over the entire public hearing process.

A proviso added in 2022 covers a project "confined to the territorial jurisdiction of one sub-division". There the District Magistrate "may alternatively authorise any officer not below the rank of Sub-Divisional Magistrate" to preside. The 2009 text (S.O. 3067(E), 1 December 2009) named only "The District Magistrate / District Collector / Deputy Commissioner or his or her representative not below the rank of an Additional District Magistrate".

Who can speak. Appendix IV, paragraph 6.4, in the 2009 Gazette text (S.O. 3067(E), 1 December 2009): "Persons present at the venue shall be granted the opportunity to seek information or clarifications on the project from the applicant." The consolidated copies print "Person present"; the Gazette text prevails, their disclaimer says. We found no limit to residents in 6.4.

Paragraph 6.1 says the attendance of "all those who are present at the venue shall be noted". Paragraph 6.3 says the applicant’s representative opens with "a presentation on the project and the Summary EIA report".

The record. The Board’s representative records a summary "accurately reflecting all the views and concerns expressed". It is read out at the end, "explaining the contents in the local / vernacular language" (6.4).

A "Statement of the issues raised by the public and the comments of the applicant" is annexed, in the local or state language and English (6.5). The proceedings are displayed at panchayat, Zila Parishad, Collector and Board offices, and on the Board’s website (6.6).

No vote. We read Appendix IV in full (July 2026 consolidated copy) and found no vote. The hearing records views; it does not decide the clearance.

Can the hearing be skipped?

Yes, in a stated case. Paragraph 7(i) III(v) covers a report that "owing to the local situation, it is not possible to conduct the public hearing in a manner which will enable the views of the concerned local persons to be freely expressed".

The regulatory authority then "may, after due consideration of the report and other reliable information that it may have, decide that the public consultation in the case need not include the public hearing." The word is "may". Written responses are still part of public consultation.

If the Board does not finish the hearing in time, the regulatory authority "shall engage another public agency or authority which is not subordinate to the regulatory authority". That agency gets "a further period of forty five days" (7(i) III(iv)).

What happens after the hearing?

The applicant "shall address all the material environmental concerns expressed during this process", and make changes in the draft EIA and the environment management plan (7(i) III(vii)).

Then comes appraisal. Paragraph 7(i) IV(i) defines it as "the detailed scrutiny by the Expert Appraisal Committee or State Level Expert Appraisal Committee of the application and other documents like the Final EIA report, outcome of the public consultations including public hearing proceedings, submitted by the applicant to the regulatory authority concerned for grant of environmental clearance."

The committee makes recommendations "either for grant of prior environmental clearance on stipulated terms and conditions, or rejection of the application for prior environmental clearance, together with reasons for the same." The regulatory authority "shall normally accept the recommendations" (8(ii)). If it disagrees, it asks the committee to reconsider.

What the Supreme Court said. In a 2019 ruling on the Mopa airport in Goa (AIRONLINE 2019 SC 318), the judgment by Justice D.Y. Chandrachud said (paragraph 102):

Public consultation cannot be reduced to a mere incantation or a procedural formality which has to be completed to move on to the next stage.

In that case, the court suspended the clearance and directed the expert committee to revisit it. The clearance "shall remain suspended" until then (paragraph 147).

What is the 2020 draft?

In 2020 the Ministry published a draft EIA Notification. Its opening says "the Central Government proposes to issue following notification". It is a proposal, not law.

The draft still lists "A public hearing" as a component of public consultation (clause 14(1)). It proposed: "A minimum notice period of twenty days shall be provided to the public for furnishing their responses."

In the Rajya Sabha on 8 March 2021, the Minister of State in the Ministry of Environment, Forest and Climate Change replied: "The draft EIA notification 2020 has received large number of suggestions, which are under consideration. Final notification is not ready."

We found no final 2020 notification. The July 2026 consolidated copy still prints the 2006 notification with its amendments.

How can people object?

The texts we read describe three routes. We describe them; we do not advise on them.

1. At the hearing. People present may "seek information or clarifications on the project from the applicant" (Appendix IV, 6.4). Their views go into the recorded summary.

2. In writing. The regulatory authority and the Board "shall invite responses" by placing the Summary EIA report on their websites (7(i) III(vi)). On "a written request from any concerned person", the draft EIA report is open "for inspection at a notified place during normal office hours till the date of the public hearing".

Appendix IV, 2.3, says local offices publicise the draft report, "requesting the interested persons to send their comments to the concerned regulatory authorities". After the hearing, comments on the proceedings "may be sent directly to the concerned regulatory authorities and the applicant concerned" (6.6).

3. Appeal to the National Green Tribunal. Section 16 of the National Green Tribunal Act, 2010 covers "Any person aggrieved by" an order granting environmental clearance "in the area in which any industries, operations or processes or class of industries, operations and processes shall not be carried out or shall be carried out subject to certain safeguards under the Environment (Protection) Act, 1986" (16(h)) or refusing it (16(i)).

Such a person "may, within a period of thirty days from the date on which the order or decision or direction or determination is communicated to him, prefer an appeal to the Tribunal".

The proviso: the Tribunal "may, if it is satisfied that the appellant was prevented by sufficient cause from filing the appeal within the said period, allow it to be filed under this section within a further period not exceeding sixty days." We read section 16 only, not the rest of the Act.

Not the same hearing. Land acquisition has its own social impact study and objections. See our land acquisition compensation guide. PESA covers gram sabhas in Scheduled Areas. See our PESA and gram sabha guide.

Examples from our reports

These are our own reports. Each line uses the live page’s words and the outlets it names, as of the page’s last update. None of them says what category the project is in, so we do not say whether a hearing was required.

  • Manori desalination plant: fishers' protest in Mumbai: Hindustan Times says it has a copy of the project’s EIA, the page (updated 11 October 2026) reports. HT says the EIA says discharge will meet Central and Maharashtra pollution control board standards. Fishers say they were not consulted, according to Hindustan Times, Free Press Journal and Urban Acres. A march was planned for 19 October.
  • Sanjauli twin tunnels protest, Shimla: the page (updated 12 October 2026) says residents raised the lack of a public hearing (Hindustan Times, PTI). A joint meeting of the Twin Tunnel Affected Joint Struggle Committee and the Shimla Nagrik Sabha on 11 October listed demands, including "a fresh, transparent public hearing in the affected areas." Himachal Scape, HimbuMail and Hindusthan Samachar report this. Himachal Scape reports NHAI saying the revised alignment was covered by the required environmental approval.
  • Thane Ring Metro protests: the page (updated 23 October 2026) cites Newsband. Maha Metro officials told it a change of alignment would need fresh approvals, including environmental clearances. In a paragraph on the tree approval, it says residents asked for a public hearing, citing NDTV Profit. It does not say what kind of hearing.

Frequently asked questions

How many days' notice is given for an EIA public hearing?

At least 30 days. Appendix IV, paragraph 3.1, says: "A minimum notice period of 30 (thirty) days shall be provided to the public for furnishing their responses". After a postponement, the 2022 amendment requires "a minimum notice period of fifteen days" before the new date.

Can anyone speak at a jan sunvai?

Paragraph 6.4 of Appendix IV, in the 2009 Gazette text, says: "Persons present at the venue shall be granted the opportunity to seek information or clarifications on the project from the applicant." Paragraph 6.2 says no quorum is needed to start.

Does the public hearing decide whether a project goes ahead?

No. We read Appendix IV in full (July 2026 consolidated copy) and found no vote. The hearing proceedings go to an expert committee for appraisal, which recommends grant or rejection with reasons. The regulatory authority "shall normally accept" that.

Is the EIA Notification 2020 in force?

No final 2020 notification was found. It was published as a draft. The Minister of State in the Ministry of Environment, Forest and Climate Change told the Rajya Sabha on 8 March 2021: "Final notification is not ready."

How long is there to appeal an environmental clearance to the NGT?

Section 16 of the National Green Tribunal Act, 2010 gives "a period of thirty days" from when the order is communicated. The Tribunal may allow "a further period not exceeding sixty days" for "sufficient cause". This is general information, not legal advice.

This guide is general information, not legal advice. It describes what the EIA Notification, 2006, its amendments, two Acts and one court ruling say about public hearings. It does not tell anyone what to do, and it does not rate any government, company or group. Rules change; the Gazette text prevails over any consolidated copy. Correction, 26 October 2026: we had said our Thane Ring Metro page was updated 11 October 2026; it was updated 23 October 2026. Correction, 26 October 2026: we had said the exemption list is in paragraph 7(i) III(i), not in the Schedule. We now say only that the list of projects that need no public consultation is in paragraph 7(i) III(i). Correction, 31 October 2026: section 16(h) covers only environmental clearance orders in the area where activities are restricted under the Environment (Protection) Act 1986; the earlier text left that limit out.

Last checked 18 October 2026.

Sources

Accessed 18 October 2026. The tag shows how much of each source we read: in full, only in part (for example a paywalled or cut-off article), or not at all.

  1. MoEFCC, Environment Impact Assessment Notification 2006 and subsequent amendments, consolidated copy "AS AMENDED UP TO JULY 2026" (PARIVESH), July 2026. Partly read The writer read the disclaimer, the preamble and paragraphs 2, 4(i), 7(i) and 8(ii). The writer also read the Schedule heading, Appendix IV in full and the amendment list. Amendments after May 2022 were not read one by one.
  2. MoEFCC, the same consolidated text, amended up to August 2023 (Tamil Nadu Pollution Control Board copy), August 2023. Partly read Paragraph 7(i) III and Appendix IV compared with the July 2026 copy.
  3. Gazette of India, S.O. 2163(E), amendment to the EIA Notification, 2006 (English and Hindi), 9 May 2022. Partly read English: read in full. Hindi: page 1 only, read on the page image.
  4. MoEFCC, draft Environment Impact Assessment Notification 2020 (copy on the Mizoram Pollution Control Board site), 2020. Partly read Opening, clause 14(1) and the public hearing notice paragraph.
  5. Rajya Sabha, Unstarred Question 1481, "Impact of draft Environment Impact Assessment Notification 2020", 8 March 2021. Read in full
  6. Environment (Protection) Act, 1986, section 3 (Indian Kanoon). Read in full
  7. National Green Tribunal Act, 2010, section 16 (Indian Kanoon). Read in full Only this section was read.
  8. Supreme Court, Mopa airport case, AIRONLINE 2019 SC 318 (Indian Kanoon), 29 March 2019. Partly read Header and paragraphs 102, 103 and 146 to 148 read by the writer.
  9. MoEFCC compendium of EIA Notification Gazette texts, Sep 2006 to Jan 2021, including S.O. 3067(E) of 1 December 2009 (scan on FAOLEX), 1 December 2009. Partly read The writer read Appendix IV paragraphs 4.0 to 6.6 of S.O. 3067(E) on the page image.
  10. The 2009 Gazette amendment apart from those paragraphs; amendments after May 2022 as published; the 24 scanned amendments; Office Memoranda; the full National Green Tribunal Act; Delhi High Court rulings; India Code; environmentclearance.nic.in and egazette.gov.in (timed out on 18 October 2026). Not read Nothing on this page rests on them.

Spotted an error, or a source we missed? Email a correction with the source that shows it. See how we handle corrections. Back to top