Short answer
India’s 2008 hydro policy names 12% free power for the host state government, not households. An extra 1% is "earmarked for a Local Area Development Fund". Affected families "would be provided" 100 units monthly for 10 years. For commission-set hydro tariffs, the 2016 Tariff Policy says free power is "as notified by the Central Government from time to time".
This guide describes what central policy texts say. It does not say what any person, village or state is owed.
Each point below is credited to the document that states it. The 2008 policy was read on an unofficial scanned copy, named in the Sources. Where we could not confirm a point, we say so.
What is the 12% free power?
It is a term of the Ministry of Power’s Hydro Power Policy 2008. The foreword by the Union Power Minister says the Cabinet approved it "in Jan' 2008".
The policy says the 12% came from an earlier policy. Its clause 10.1(d) reads: "The dispensation accorded under the Hydro Policy of 1998, regarding 12% free power to be provided to the host state government, will, however, be supplemented by an additional 1% in accordance with Clause (h) below." We did not read the 1998 policy.
Royalty. The policy uses this word for the 12%. Section 9.2 says host State governments "have been turned into stake-holders by stipulating that 12% of the power is given to them free cost as a royalty, there is need to turn the project affected areas and persons also into stake-holders with a continuing stake not only in the completion but also in the continued operation of the project."
Host state. The booklet uses "host state government", and the Secretary’s foreword uses "host states". We found no definition of the term in the parts we read.
The policy also has states choose developers on one parameter, which can be more than 12% free power. Clause 10.1(b) says "The States will call for bids" from short-listed developers "on a single quantifiable parameter". It names options such as "more than 12% free power or equity participation or upfront payment etc."
Who gets it?
The policy names the state government, not households. Clause 10.1(d) speaks of "12% free power to be provided to the host state government". The Ministry of Power Secretary’s foreword calls it "the 12% meant for host states".
The policy names a separate benefit for families. Clause 10.1(i) reads: "For a period of 10 years from the date of commissioning of the project, 100 units of electricity per month would be provided by the project developer to each Project Affected Family through the relevant distribution company." It goes on: "It is expected that the PAF will consume at least the minimum lifeline consumption of one unit per day and the cost of balance unused electricity, if any, could be made available to PAF in cash or kind or a combination of both, at rates to be determined by the State Electricity Regulatory Commission."
The 2016 Tariff Policy keeps a similar line, for projects covered under its paras 5.5 and 5.6. Its para 5.7(iii)(b) speaks of "100 units of electricity to be provided free of cost every month to every Project Affected Family notified by the State Government to be offered through the concerned distribution licensee in the designated resettlement area/projects area for a period of ten years from the date of commissioning". We did not confirm which projects give this today.
Project Affected Family. The 2016 Tariff Policy’s Appendix defines it: "A Project Affected Family (PAF) shall mean a family whose place of residence or other property or source of livelihood has been affected by the development of a hydro project and who have been residing in the affected zone for two years preceding the date of declaration of notification under Section-11 of the LARR Act. The affected family would also include squatters." The parts we read do not spell out "LARR".
In a Rajya Sabha answer of 10 August 2021, the Ministry of Power listed this feature as: "Developer to provide 100 units of electricity per month to each Project Affected Family - in cash or kind or a combination of both for 10 years from the COD." The answer does not spell out "COD".
For what the land law says on rehabilitation and resettlement, see our guide to dam-displacement protests and oustees.
What is the local area development fund?
The policy defines its aim in clause 10.1(h). It reads: "An additional 1% free power from the project would be provided and earmarked for a Local Area Development Fund, aimed at providing a regular stream of revenue for income generation and welfare schemes, creation of additional infrastructure and common facilities etc. on a sustained and continued basis over the life of the project."
The state’s matching 1%. The same clause only recommends this. It says: "It is recommended that the host state governments would also provide a matching 1% from their share of 12% free power towards this corpus." The Secretary’s foreword says the matching 1% is "expected to come from the State Government’s share of 12% free power".
Who runs it. The clause says the fund "could be operated by a standing committee headed by an officer of the State Government, not lower than a district magistrate to be designated by the State Government, male and female representatives of the Project Affected People and the project head nominated by the developer." The word is "could".
Is it 1% of power or of revenue? The sources differ in their wording. The 2008 policy says "An additional 1% free power". A PIB release of 8 April 2026 names three hydropower projects besides Kamala. It says "all projects will provide 12% free power to the host states and support local development through a Local Area Development Fund equivalent to 1% of project revenue". We found no rupee amount for the fund in the 2008 policy.
Is the 12% a legal right?
None of the texts we read calls it a right. The 2008 text is a policy approved by the Cabinet. In the texts we read, the 12% and the 1% appear in policies and a Tariff Policy resolution. We did not find them in an Act, but we did not search every Act. We read no court ruling on this point.
The Tariff Policy’s para 2.1 says: "Section 3 (1) of the Electricity Act, 2003 empowers the Central Government to formulate the tariff policy." Its para 2.2 says the electricity regulatory commissions "shall be guided by the tariff policy in discharging their functions including framing the regulations". That is about the commissions, not about a person’s claim.
What has changed since 2008?
- 31 March 2008. A Ministry of Power resolution amended the 2006 Tariff Policy. The policy booklet prints it as Annexure 5. It added text for "a developer, of a hydroelectric project, not being a State controlled/owned company" who opts for tariff set by the appropriate Commission. For those projects, saleable energy is worked out by deducting items "from the design energy at the bus bar"; the parts we read do not define that phrase. The first item is "13% of free power (12% for the host Government and 1% for contribution towards Local Area Development Fund as constituted by the State Government)". It added: "This 12% free power may be suitably staggered as decided by the State Government".
- 28 January 2016. The new Tariff Policy dropped the fixed figures from that line. Para 5.7 applies "In case of projects covered under Para 5.5 and 5.6", where the Commission determines tariff. Para 5.7(iii)(a) now reads: "Free power as notified by the Central Government from time to time for the host State and the riparian State and percentage for contribution towards Local Area Development Fund as constituted by the State Government. This free power may be suitably staggered as decided by the State Government." The parts we read do not define "riparian State".
- 7 March 2019. The Cabinet approved "Measures to promote Hydro Power Sector" (PIB). The release covers renewable energy status, tariffs, flood moderation and roads. We found no mention of free power or the local fund in it.
- 10 August 2021. In a Rajya Sabha answer, the Ministry of Power said: "Government of India has issued Hydro Power Policy 2008 for development of hydro power sector in the country including the hilly States." Its list of features repeats the extra 1% for the fund, "over and above 12% free power earmarked for the host State".
- 28 August 2024. A PIB release on a scheme for the North Eastern Region says: "States would be required to waive / stagger free power and / or reimburse SGST to make the project viable." That line is about that scheme.
- 8 April 2026. A PIB release on the Kamala Hydro Electric Project in Arunachal Pradesh says: "The State will receive 12% free power and an additional 1% earmarked for the Local Area Development Fund (LADF), along with significant infrastructure development and socio-economic benefits for the region." The release says the Cabinet Committee on Economic Affairs approved investment for its construction.
For how hydropower fits with other dam purposes, see our guide to multipurpose river valley projects.
What is not confirmed?
- We found no central notification of a free-power percentage made after the 2016 Tariff Policy. We did not search the Gazette for one.
- We did not check later amendments to the 2016 Tariff Policy.
- We could not confirm which projects or states apply the 12% and the 1% today.
- We did not read any state’s rules on free power, the local fund or free units for families. So we do not say how states differ.
- We read no source on what older projects give. So we do not say whether they give these terms.
- We read the 2008 policy on an unofficial scanned copy. We could not open a Ministry of Power copy.
Examples from our reports
No live report of ours covers free power or a local area development fund. See also these two reports on a hydropower project and a river project. Neither is a free-power example.
- Kulsi dam protests on the Assam-Meghalaya border: our report describes the Kulsi Multipurpose Project as "a 55 MW hydropower and irrigation project planned at Ukiam" (updated 26 October 2026). It does not mention free power or a local fund.
- Bedti-Aghanashini river-linking protest in Karnataka: our report is about two proposed river links. It says protesters "want both projects scrapped and work on the Bedti-Varada project report stopped" (published 11 October 2026).
Frequently asked questions
Do people living near a hydro project get 12% free electricity?
Not under the policy’s words. The 2008 policy gives the 12% to the "host state government". Separately, it says 100 units a month "would be provided" to each Project Affected Family for 10 years from commissioning. We did not confirm which projects give this today.
Is the local area development fund paid to families in cash?
The 2008 policy does not say so in the clause we read. It says the fund is for "income generation and welfare schemes, creation of additional infrastructure and common facilities etc." We did not read any state’s rules on how the fund is spent.
Must the state add a matching 1% to the fund?
The policy recommends it but does not require it in the words we read. It says: "It is recommended that the host state governments would also provide a matching 1% from their share of 12% free power towards this corpus."
Is the 2008 hydro policy still in force?
The Ministry of Power described it in the Rajya Sabha on 10 August 2021. It said the Government "has issued Hydro Power Policy 2008". We could not confirm its status today. The 2016 Tariff Policy no longer prints the 12% figure. For projects whose tariff a commission sets under its paras 5.5 and 5.6, it says free power is "as notified by the Central Government from time to time".
Can a state get more than 12%?
The 2008 policy says "The States will call for bids" on "a single quantifiable parameter". Its options include "more than 12% free power or equity participation or upfront payment etc." We did not check which states have done this.
This guide is general information, not legal advice. Policies and their use change, and each project has its own terms. We do not say what any person or state is owed. Check the latest official text.
Last checked 30 October 2026.
Sources
Accessed 30 October 2026. The tag shows how much of each source we read: in full, only in part (for example a paywalled or cut-off article), or not at all.
- Ministry of Power, "Hydro Power Policy 2008" booklet (IELRC scanned copy; unofficial, not hosted by the ministry), 2008. Partly read Forewords, sections 9.1 and 9.2, section 10.1 and Annexure 5 (the Tariff Policy amendment of 31 March 2008) read.
- "Salient Features of Hydro Power Policy 2008" (two-page scan, NEDFI databank), 2008. Read in full Poor scan; quotes on this page are taken from the booklet, which has the same clauses.
- Ministry of Power, Resolution No. 23/2/2005-R&R (Vol-IX), "Tariff Policy", Gazette of India Extraordinary No. 39 (MERC copy), 28 January 2016. Partly read Paras 2.1, 2.2, 5.5 to 5.7 and the Appendix's opening items read. Later amendments not checked.
- PIB, "Measures to promote Hydro Power Sector", 7 March 2019. Read in full
- Ministry of Power, Rajya Sabha Unstarred Question No. 2542, "Hydro-electric projects in hilly States", 10 August 2021. Partly read This answer read in full; the other answers in the file not read.
- PIB, "Cabinet approves Central Financial Assistance towards Equity Participation by the State Governments of the North Eastern Region for development of Hydro Electric Projects in the North Eastern Region", 28 August 2024. Partly read The scheme's opening and its viability paragraph read.
- PIB (Cabinet Committee on Economic Affairs), Cabinet approval of the investment proposal for the 1720 MW Kamala Hydro Electric Project, Arunachal Pradesh (Release ID 2250042), 8 April 2026. Partly read The opening and the two free-power sentences read.
- The Hydro Policy of 1998; a Ministry of Power copy of the 2008 policy; the Ministry of Power office memorandum of 8 March 2019 (a scan we could not read as text); any central notification of a free-power percentage after 2016; state rules on free power and local area development funds. Not read No point on this page rests on these.
Spotted an error, or a source we missed? Email a correction with the source that shows it. See how we handle corrections. Back to top