Guide
Do metro, highway and flyover projects need environmental clearance in India?
Which projects Highways Splitting When Metro Flyovers Hearing Other permissions In the news Unconfirmed Examples FAQ Sources
Short answer
It depends on the project. The EIA Notification 2006, as amended up to July 2026, lists new national and state highways. It also lists national highway expansions over 100 km with extra land beyond set widths, and some state highway expansions. Its list has no metro or flyover row. The Supreme Court kept the metro question open in 2023.
This guide is general information, not legal advice. It describes which clearance texts list which projects, and what courts and tribunals have said. It does not say whether any project is lawful, and it does not tell anyone what to do. We read the texts on 26 October 2026.
Which projects need environmental clearance in India?
The main text is the Environment Impact Assessment (EIA) Notification, 2006. We read the Ministry of Environment, Forest and Climate Change’s copy marked "AS AMENDED UP TO JULY 2026". Its disclaimer says office memoranda are not included. It also says: "In case there is a discrepancy, then the principal notification read along with the amendment issued in the gazette of India shall prevail".
Paragraph 2 says the listed projects "shall require prior environmental clearance". The clearance must come "before any construction work, or preparation of land by the project management except for securing the land, is started on the project or activity". It covers "All new projects or activities listed in the Schedule to this notification". It also covers some expansions of listed projects, beyond the Schedule’s thresholds and subject to paragraph 7(ii).
The Schedule is headed "LIST OF PROJECTS OR ACTIVITIES REQUIRING PRIOR ENVIRONMENTAL CLEARANCE". Paragraph 7(i) I(B) adds: "The cases as specified in Appendix IX shall be exempted from prior environmental clearance." A footnote says the 2016 notification that inserted this was suspended by the NGT on 11 December 2018. It says this was appealed in the Supreme Court and the "matter is sub-judice". We did not check its status. We found no definition of "environmental clearance" in the parts we read. The Oxford Learner’s Dictionary defines clearance as "official permission that is given to somebody before they can work somewhere, have particular information, or do something they want to do".
Rows are split into Category A and Category B. Paragraph 2 sends Category A to the Central Government. It sends Category B to the State Environment Impact Assessment Authority (SEIAA). Paragraph 4(i) says the split is "based on the spatial extent of potential impacts and potential impacts on human health and natural and man-made resources".
| Project | What the July 2026 copy shows |
|---|---|
| New national highway | Category A, item 7(f): "New National Highways". |
| Expansion of a national highway | Category A, item 7(f). Only if over 100 km, with extra right of way or land over 40 m on the existing alignment. On re-alignments or bypasses the width is 60 m. |
| New state highway | Category B, item 7(f): "All New State Highway Projects". |
| Expansion of a state highway | Category B, item 7(f), only "in hilly terrain (above 1,000 m AMSL) and or ecologically sensitive areas". |
| Expressway | Note (i) to item 7(f): "Highways include expressways." |
| Metro rail | No row. The word "metro" does not appear in the copy. |
| Flyover or elevated road | No row names them. Item 8 lists building, construction and area development projects by size. |
When does a highway project need environmental clearance?
Item 7(f) is headed "Highways". In the July 2026 copy, the Category A column reads:
i) New National Highways; and ii) Expansion of National Highways greater than 100 km involving additional right of way or land acquisition greater than 40m on existing alignment and 60 m on re-alignment or by-passes
The Category B column reads:
i) All New State Highway Projects; ii) State Highway expansion projects in hilly terrain (above 1,000 m AMSL) and or ecologically sensitive areas.
The notes say "(i) Highways include expressways." They also say:
(ii) All Highway projects are exempted upto 100 km from line of control or border subject to compliance of Standard Operating Procedure notified in this regard from time to time. (iii) Width at toll plaza and junction improvement at intersection of other roads is exempted from Right of Way.
The hyphens in "re-alignment" and "by-passes" fall at line breaks in the copy, so the printed spelling may differ. The copy does not spell out AMSL in the parts we read. A footnote says note (iii) was added on 14 July 2022.
Item 7(f) also says "General Condition shall apply." The General Condition says:
Any project or activity specified in Category ‘B’ will be appraised at the Central Level as Category ‘A’, if located in whole or in part within 5 km from the boundary of:
The areas listed are notified Protected Areas, Critically Polluted areas, notified Eco-sensitive areas, and "inter-State boundaries and international boundaries". Our eco-sensitive zone guide explains those zones.
The older test. The 2006 text was different. The Supreme Court’s 2020 ruling (below) reproduces the 2006 Schedule. Its Category A column for item 7(f) reads: "Expansion of National High ways greater than 30 KM, involving additional right of way greater than 20m involving land acquisition and passing through more than one State". The 2021 ruling (below) says a notification of 22 August 2013 brought in the 100 km test. We did not read the 2013 notification itself. The copy’s footnotes print its number as both S.O. 2559(E) and S.O. 2259(E).
Can a highway project be split into parts to avoid clearance?
The Supreme Court dealt with this on 19 January 2021, in Civil Appeal Nos. 4035-4037 of 2020. The case was about widening NH-45A between Villuppuram and Nagapattinam in Tamil Nadu and Puducherry. The ruling says the 179.555 km project was divided into four packages. Each package was under 100 km.
Paragraph 15 of the ruling says:
A conspectus of the above discussion leads to the unerring conclusion that there is no ambiguity in Item 7 (f) of the Schedule to the Notification that prior environmental clearance is required for expansion of a National Highway project only if: (a) The National Highway is greater than 100 kms. (b) The additional right of way or land acquisition is greater than 40 meters on existing alignments and 60 meters on realignments and by passes.
On splitting, paragraph 19 says:
Therefore, we are in agreement with the High Court that segmentation as a strategy is not permissible for evading environmental clearance as per Notifications dated 14.09.2006 and 22.08.2013.
Paragraph 20 asks whether splitting a national highway beyond 100 km "is impermissible under any circumstance". The court said: "As we lack the expertise of deciding upon this issue, we are of the considered view that an expert committee should examine the permissibility of segregation." Its third direction says:
The Ministry of Environment, Forest and Climate Change, Government of India shall constitute an Expert Committee to examine whether segmentation is permissible for National Highway projects beyond a distance of 100 kms and, if permissible, under what circumstances.
We did not find whether that committee was set up, or what it said. In that case, the first direction says there is "no requirement for obtaining environmental clearances" for NH-45A. It gives the reason: "as land acquisition is not more than 40 meters on existing alignments and 60 meters on realignments or by passes."
Right of way and toll plazas. The notification does not define right of way in the parts we read. Paragraph 23 of the 2021 ruling says: "As Para 2.3 of the aforementioned Manual makes it clear that right of way is the total land width required for the project Highway to accommodate right of way, side drains, service roads, tree plantations, utilities etc., toll plazas and rest houses should be included in the “right of way”." The manual is a Planning Commission manual on two-laning highways. Paragraph 24 says: "For the sake of clarity, we hold that the “right of way” includes the existing National Highway and the additional right of way." The July 2026 copy’s note (iii), added in 2022, exempts "Width at toll plaza and junction improvement" from right of way. We show both texts. We did not compare them further.
When must a highway get its clearance?
Paragraph 2 of the notification sets the time: before construction or land preparation starts, except for securing the land. The Supreme Court spoke to this on 8 December 2020. The executing agency was the National Highways Authority of India (NHAI). That case was about the Chennai-Krishnagiri-Salem eight-lane national highway (Civil Appeal Nos. 3976-3977 of 2020 and connected appeals). Paragraph 65 says:
suffice it to observe that the prior environmental clearance in terms of 2006 notification issued under Section 3 of the Environment (Protection) Act, 1986 Act read with Rule 5 of the Environment (Protection) Rules, 1986, is required to be taken before commencement of the “actual construction or building work” of the national highway by the executing agency (NHAI). That will happen only after the acquisition proceedings are taken to its logical end until the land finally vests in the NHAI or is entrusted to it by the Central Government for building/management of the national highway.
The same paragraph says the application for clearance "can be commenced parallelly or alongside the acquisition process after a preliminary notification under Section 3A of the 1956 Act, for acquisition is issued." The ruling uses "the 1956 Act" for the National Highways Act, 1956.
Paragraph 65 says this position is "reinforced and explained in the Office Memorandum issued by the MoEF dated 7.10.2014". We read that memorandum only as the ruling quotes it. The court set limits on its own ruling. Paragraph 77 says:
While parting, we must place on record that we have not expressed any opinion either way on the correctness and validity of the permissions/clearances accorded by the competent authorities under the environment and forest laws, as the case may be.
Does a metro rail project need environmental clearance?
The July 2026 copy has no Schedule row for metro rail or railways. We searched the whole copy, and the word "metro" does not appear in it. No text we read says metro projects are exempt either.
The Noida metro case. On 31 May 2016 and 5 July 2016, the National Green Tribunal (NGT), Principal Bench, gave directions on the Noida to Greater Noida metro. A Supreme Court order of 2023 reproduces them. The first reads:
We hold and declare that the project in question, that is, the Metro Construction from Noida to Greater Noida is a project covered under Entry 8(b) of the Schedule to the Notification of 2006.
The tribunal directed the project body to get clearance. We read these directions only as the 2023 order reproduces them. We did not read the tribunal’s judgment itself.
The metro and rail bodies concerned appealed. The Supreme Court disposed of the appeals on 4 January 2023, in Civil Appeal No. 8762 of 2016 with No. 9070 of 2016. The order records that on 16 September 2016 the court "had stayed the impugned orders". The stay was "pending further orders from this Court". The 2023 order then says:
In that view of the matter when the entire metro rail project is complete and the metro rail is running, the clock cannot be put back and the same shall not be even in the larger public interest.
The bench of Justices M.R. Shah and C.T. Ravikumar said the tribunal’s directions "are not to be acted upon in the peculiar facts and circumstances of the case." Senior counsel for the contesting respondents asked the court to consider the questions of law on merits. The order says: "We refuse to accede to the said prayer." It ends:
However, the questions of law, if any, more particularly, whether with respect to the rail project/metro rail project, the environmental clearance is required or not and other questions of law, if any, are kept open to be considered in appropriate proceedings and the present order shall not be cited as a precedent in any other matters/cases.
We read no later ruling that decides the question.
The metro construction law. The Metro Railways (Construction of Works) Act, 1978 deals with building metro railways. Section 1(3) says it applies first to Calcutta, and to other areas by notification. In the Indian Kanoon copy we read, the word "environment" does not appear. Section 18 sets the metro railway administration’s functions "Subject to the control of the Central Government". Section 25(3) lists "the removal of trees or standing crops, if any" among the damage to be weighed when fixing a payment. The copy says its content "could not be verified". We did not check which law each metro project is built under.
Do flyovers and elevated roads need environmental clearance?
The Oxford Learner’s Dictionary (British English) defines a flyover as "a bridge that carries one road over another one". The July 2026 Schedule has no row that names a flyover, a bridge or an elevated road. No text we read says flyovers are exempt either.
Item 8. Item 8 lists only Category B projects. Item 8(a), "Building and Construction projects", covers "≥ 20,000 sq.m. and < 1,50,000 sq. m. of built up area". Item 8(b), "Townships and Area Development Projects", covers "Covering an area ≥ 50 ha and/or built up area ≥ 1,50,000 sq. m." Built up area is defined as "the built up or covered area on all floors put together, including its basement and other service areas, which are proposed in the building or construction projects."
A 2017 tribunal ruling. The NGT’s Southern Zone ruled on 13 March 2017 on a six-lane elevated road in Bengaluru (Application Nos. 243 and 245 of 2016 (SZ)). The ruling calls the notification "Regulations 2006" for short. Paragraph 96 relies on two earlier NGT rulings. It describes one as about a bridge across the Yamuna, and the other as about an elevated bridge connecting two existing roads. Karnataka’s Advocate General and counsel for the project body argued:
The argument is that being a sixlane elevated road connecting two other existing roads, which are neither National Highway nor a State Highway, no Prior EC is necessary as the project if at all can only fall under Entry 7(f) of the Schedule.
The tribunal recorded that the project’s side relied on the environment ministry’s reply. That reply said the project "does not fall under any of the Entries listed in Schedule and therefore, no prior EC is required". The tribunal said: "we cannot accept the submission that irrespective of the legal position on whether prior EC is necessary or not, the opinion of the MoEF is to be accepted or is binding on the Tribunal." Paragraph 111 says:
In view of the earlier discussions and findings, we hold that the proposed project of construction of the six lane elevated road from Basaveshwara Circle to Hebbal flyover would fall under Entry 8(b) of the Schedule of Regulations 2006. Therefore, the project requires prior EC as provided under Para 7 of Regulations 2006.
That was the tribunal’s holding in that case. Paragraph 110 says "the project involves more than 1,50,000 sq.meters built up area and the project falls under Entry 8(b) of the schedule to the Regulations 2006." Item 8 has been reworded since. A footnote says its entries were substituted on 29 January 2025. We did not check the case’s later history. We read no Supreme Court ruling on flyovers.
Is there always a public hearing?
No. Paragraph 7(i) III(i) defines public consultation:
“Public Consultation” refers to the process by which the concerns of local affected persons and others who have plausible stake in the environmental impacts of the project or activity are ascertained with a view to taking into account all the material concerns in the project or activity design as appropriate.
Paragraph 7(i) I(A) says: "The projects requiring an Environmental Impact Assessment report shall be termed Category ‘B1’ and remaining projects shall be termed Category ‘B2’ and will not require an Environment Impact Assessment report." Paragraph 7(i) III(i) says "All Category ‘A’ and Category B1 projects or activities shall undertake Public Consultation, except the following". The exceptions include:
- (c) "expansion of Roads and Highways (item 7 (f) of the Schedule) which do not involve any further acquisition of land."
- (d) "All Building or Construction projects or Area Development projects (which do not contain any category ‘A’ projects and activities) and Townships (item 8 (a) and 8(b) in the Schedule to the notification)."
- (e) "all Category ‘B2’ projects and activities."
- (g) "all linear projects such as Highways, pipelines, etc., in border States."
Under paragraph 7(i) III(iii), the State Pollution Control Board or the Union Territory Pollution Control Committee conducts the public hearing. It sends the proceedings to the regulatory authority within 45 days of the applicant’s request. Our EIA public hearing guide explains how a hearing works.
What other permissions can these projects need?
Environmental clearance is one permission among several. The 2020 ruling itself refers to permissions "under the environment and forest laws". Our forest clearance guide covers forest land. Our land acquisition guide covers land acquisition.
Trees are handled under state laws. In the 2017 Bengaluru case, the tribunal said: "The enquiry contemplated by the Tree Officer as provided under Section 8 of KPTA is not equivalent to the Environment Impact Assessment contemplated under Regulations 2006." KPTA is the Karnataka Preservation of Trees Act, 1976. Our tree-felling guide covers state tree laws.
In the 2021 NH-45A case, the Supreme Court said: "There is an obligation on the part of the Appellant to plant ten trees for each felled tree." That was about the highway body in that case.
What do recent news reports say?
These are news reports, not our reports. Each line keeps the outlet’s own words and date.
Bengaluru twin tunnel road. Deccan Herald reported on 22 December 2025 on activists’ application to the NGT. It said the environment ministry replied: "There is no separate independent requirement of prior EC exclusively for the construction of a tunnel under the EIA notification, 2006". Deccan Herald said the ministry added that a tunnel can need prior clearance "only when it forms an integral part" of a project listed in item 7(f). This is the ministry’s reply as reported, not a ruling. We did not check the case’s later progress.
Nagpur–Chandrapur expressway. Nagpur Today reported on 22 October 2026 that a public hearing is planned for 25 November 2026. It said the Maharashtra Pollution Control Board (MPCB) issued the notice. The hearing is set for Samudrapur, in Wardha district. Nagpur Today said the Maharashtra State Road Development Corporation’s Executive Engineer had requested it.
Thane metro trees. The Free Press Journal reported on 19 October 2026 that a public interest litigation (PIL) "has been filed challenging tree-felling permissions granted by the Thane Municipal Corporation (TMC) for the Thane Integral Ring Metro project, alleging that the civic administration acted arbitrarily without constituting the mandatory statutory Tree Authority." The case is in the Bombay High Court. It concerns tree permissions, not environmental clearance. The report gives no court order.
What could we not confirm?
- The 2013 notification that brought in the 100 km test. We read it only as the 2021 ruling describes it.
- Office memoranda on highways or metros. The July 2026 copy does not include them, and the Gazette text prevails over it.
- Whether the expert committee on splitting highways was set up.
- The NGT’s 2016 metro judgment and the Supreme Court’s 2016 stay order. We read both only as the 2023 order records them.
- A 2025 Supreme Court judgment that a footnote says quashed a note to item 8(a). We did not read it.
- The Standard Operating Procedure for highways near the border, and the later history of the 2017 Bengaluru case.
Examples from our reports
We link two live reports. Each line keeps the page’s own words and outlets, as on its update date. See also: our EIA public hearing guide and our forest clearance guide.
- Thane Ring Metro protests: what residents want: updated 23 October 2026. The page says "Maha Metro officials told Newsband that stations can be reconsidered, but a change of alignment would need fresh approvals, including environmental clearances."
- Sanjauli residents vs NHAI twin tunnels, Shimla: updated 12 October 2026. The page says that on Saturday 19 September a district team led by an Additional District Magistrate (ADM) visited, "and the administration directed NHAI to stop tunnel work". It credits this date to Hindustan Times. It also says "Himachal Scape reports NHAI saying the revised alignment was covered by the required environmental approval. We read no NHAI document."
Frequently asked questions
Is a metro project exempt from environmental clearance?
We read no text that says so. The July 2026 copy of the Schedule has no metro row. In 2023 the Supreme Court kept open "whether with respect to the rail project/metro rail project, the environmental clearance is required or not". It said its order "shall not be cited as a precedent".
Does a highway under 100 km need environmental clearance?
It depends on the type. The item 7(f) entries for new national and state highways give no length. The 100 km test is for widening national highways, together with the land-width test. Note (ii) exempts highway projects "upto 100 km from line of control or border", subject to a Standard Operating Procedure.
Can a long highway be split into short packages?
In the NH-45A case of 2021, the Supreme Court agreed with the High Court that "segmentation as a strategy is not permissible for evading environmental clearance". It directed the environment ministry to set up an expert committee on whether, and when, splitting is permissible. We did not find its report.
Does every flyover need environmental clearance?
No text we read says so, and none says flyovers are exempt. In 2017 the NGT’s Southern Zone held that one six-lane elevated road in Bengaluru fell under Entry 8(b), in that case. Item 8 has been reworded since.
Who grants clearance for a highway?
Category A rows go to the Central Government and Category B rows to the state’s SEIAA, paragraph 2 says. The General Condition moves a Category B project to the Central level, as Category A, within 5 km of listed areas. This is general information, not legal advice.
This guide is general information, not legal advice. It describes the EIA Notification 2006 as amended up to July 2026 and the Metro Railways (Construction of Works) Act. It also uses two Supreme Court judgments, a Supreme Court order, a tribunal ruling, three news reports and two of our live reports. Each source is dated where it gives a date, and credited. It takes no side on any government, company, party or group.
Last checked 26 October 2026.
Sources
Accessed 26 October 2026. The tag shows how much of each source we read: in full, only in part (for example a paywalled or cut-off article), or not at all.
- Ministry of Environment, Forest and Climate Change, Environment Impact Assessment Notification 2006 and subsequent amendments, "AS AMENDED UP TO JULY 2026" (Parivesh copy), July 2026. Partly read Read by the writer: disclaimer, paragraphs 2, 4(i), 7(i) I(A) and I(B), 7(i) III(i)-(iii), Appendix IX, the Schedule heading, items 7(f) and 8 with footnotes, and the General Condition. The whole copy was searched for metro, rail, flyover, elevated, bridge and road. The Gazette text prevails over this copy.
- Supreme Court of India, judgment in Civil Appeal Nos. 4035-4037 of 2020 (NH-45A expansion), 19 January 2021. Read in full Read by the writer. Cited by case number; the title names private parties.
- Supreme Court of India, judgment in Civil Appeal Nos. 3976-3977 of 2020 and connected appeals (Chennai-Krishnagiri-Salem highway), 8 December 2020. Partly read Paragraphs 2, 65 and 77-83 and the reproduced 2006 Schedule entry for item 7(f) read by the writer. Cited by case number; the title names private parties.
- Supreme Court of India, order in Civil Appeal No. 8762 of 2016 with Civil Appeal No. 9070 of 2016 (Noida metro) (Indian Kanoon copy), 4 January 2023. Read in full Read by the writer. Cited by case number; the title names organisations.
- National Green Tribunal, Southern Zone, judgment in Application Nos. 243 and 245 of 2016 (SZ) (Bengaluru elevated road) (Indian Kanoon copy), 13 March 2017. Partly read Header, counsel list, paragraph 2 (the ‘Regulations 2006’ short form) and paragraphs 95-112 read by the writer. Cited by case number; the title names a private applicant.
- The Metro Railways (Construction of Works) Act, 1978 (Indian Kanoon copy). Partly read Read by the writer: the copy’s note, sections 1(3), 2, 4, 18, 24 and 25; searched for "environment". The copy says its content "could not be verified".
- Oxford Learner’s Dictionaries, "flyover". Read in full Read by the writer.
- Oxford Learner’s Dictionaries, "clearance". Read in full Read by the writer.
- Deccan Herald, "No prior environmental clearance needed for Bengaluru twin tunnel project: Centre tells NGT", 22 December 2025. Read in full Read by the writer from the page’s article text.
- Nagpur Today, "Nagpur–Chandrapur Expressway: Environmental Public Hearing on November 25", 22 October 2026. Read in full Read by the writer.
- Free Press Journal, "Thane Metro Project Faces Bombay HC Challenge Over Tree-Felling Approvals For 4,600 Trees, Alleged Bypassing Of Statutory Tree Authority", 19 October 2026. Read in full Read by the writer from the page’s article text. Only the filing sentence is used.
- All India Protest, Thane Ring Metro protests: what residents want (our live report), updated 23 October 2026. Read in full Used for the example line only.
- All India Protest, Sanjauli residents vs NHAI twin tunnels, Shimla (our live report), updated 12 October 2026. Read in full Used for the example line only.
- Newsband, Himachal Scape and Hindustan Times. Not read Named only as our live reports credit them; not opened for this guide.
- The 2013 highway notification (S.O. 2559(E)); the NGT’s 2016 metro judgment; the Supreme Court’s 2016 stay order; the 2025 Supreme Court judgment on item 8(a); office memoranda (the 7 October 2014 memorandum only as the 2020 ruling quotes it); the NGT order suspending the 2016 notification; the border Standard Operating Procedure. Not read Not opened.
Spotted an error, or a source we missed? Email a correction with the source that shows it. See how we handle corrections. Back to top